U.S. Code of Federal Regulations
Regulations most recently checked for updates: Oct 04, 2024
§ 52.2420 - Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Virginia under section 110 of the Clean Air Act, 42 U.S.C. 7410 and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to July 1, 2016, were approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Entries in paragraphs (c) and (d) of this section with the EPA approval dates after July 1, 2016 for the Commonwealth of Virginia, have been approved by EPA for inclusion in the State implementation plan and for incorporation by reference into the plan as it is contained in this section, and will be considered by the Director of the Federal Register for approval in the next update to the SIP compilation.
(2) EPA Region III certifies that the materials provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated Commonwealth rules/regulations which have been approved as part of the state implementation plan as of the dates referenced in paragraph (b)(1).
(3) Copies of the materials incorporated by reference into the state implementation plan may be inspected at the Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. To obtain the material, please call the Regional Office at (215) 814-3376. You may also inspect the material with an EPA approval date prior to July 1, 2016 for the Commonwealth of Virginia at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA-Approved regulations.
EPA-Approved Virginia Regulations and Statutes
State citation | Title/subject | State
effective date | EPA approval date | Explanation
[former SIP citation] |
---|---|---|---|---|
5-10-10 | General | 8/1/02 | 3/15/04, 69 FR 12074 | Revised paragraphs A, B, C. |
5-10-20 | Terms Defined | 5/4/05 | 8/18/06, 71 FR 47742 | Revised definition of “volatile organic compound”. |
5-10-20 | Terms Defined | 4/2/09 | 2/25/10, 75 FR 8493 | Revised definitions of Ambient air quality standard, Criteria pollutant, Dispersion technique, Emission limitation, Emission standard, Excessive concentration, Feral Clean Air Act, Federally enforceable, Good engineering practice, Initial emission test, Initial performance test, Public hearing, Reference method, Regulations for the Control and Abatement of Air Pollution, Reid vapor pressure, Run, Standard of performance, State enforceable, These regulations, True vapor pressure, Vapor pressure, and Volatile organic compound. |
5-10-20 | Terms Defined | 2/18/10 | 2/14/11, 76 FR 8298 | Revised definition of “Volatile organic compound.” |
5-10-20 | Terms Defined | 12/5/13,
3/27/14 | 8/7/14, 79 FR 46186 | Revised definition of VOC. |
5-10-20 | Terms Defined | 8/28/13 | 1/21/15, 80 FR 2834 | Terms Added—Certified Mail, Mail. |
5-10-20 | Terms Defined | 3/12/15 | Definition of VOC is revised by adding two chemicals ( | |
5-10-20 | Terms Defined | 7/30/15 | 11/27/15, 80 FR 73997 | Definition of VOC is revised by adding 2-amino-2-methyl-1-propanol to the list of substances not considered to be VOCs. |
5-10-20 | Terms Defined | 12/15/16 | 3/13/18, 83 FR 10791 | Definition of “volatile organic compound” is revised by removing the recordkeeping, emissions reporting, photochemical dispersion modeling, and inventory requirements related to the use of t-butyl acetate (also known as tertiary butyl acetate or TBAC) as a VOC. |
5-10-20 | Terms Defined | 5/19/17 | 3/13/18, 83 FR 10791 | Definition of “volatile organic compound” is revised by adding 1,1,2,2,-Tetrafluoro-1-(2,2,2-trifluoroethoxy) ethane (also known as HFE-347pcf2) to the list of compounds excluded from the regulatory definition of VOC. |
5-10-30 | Abbreviations | 8/17/11 | 2/25/14 [79 FR 10377] | Revised. |
5-20-10A.-C | Applicability | 4/17/95 | 4/21/00, 65 FR 21315 | 120-02-01. |
5-20-70 | Circumvention | 4/17/95 | 4/21/00, 65 FR 21315 | 120-02-07. |
5-20-80 | Relationship of state regulations to Federal regulations | 4/17/95 | 4/21/00, 65 FR 21315 | 120-02-08. |
5-20-121 | Air Quality Program Policies and Procedures | 7/1/97 | 4/21/00, 65 FR 21315 | Appendix S. |
5-20-160 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-02-31. |
5-20-170 | Control Programs | 4/17/95 | 4/21/00, 65 FR 21315 | 120-02-32. |
5-20-180 | Facility and control equipment maintenance or malfunction | 6/1/2016 | 6/22/2023, 88 FR 40718 | Revised 9VAC5-20-180(A) through 9VAC5-20-180(D) and 9VAC5-20-180(F) through 9VAC5-20-180(J). |
5-20-200 | Air Quality Control Regions (AQCR) | 7/1/97 | 4/21/00, 65 FR 21315 | Appendix B. |
5-20-202 | Metropolitan Statistical Areas | 7/1/97 | 4/21/00, 65 FR 21315 | Appendix G. |
5-20-203 | Air Quality Maintenance
Areas | 3/11/15 | 8/14/15, 80 FR 48732 | List of maintenance areas revised to include Northern Virginia localities for fine particulate matter (PM |
5-20-204 | Nonattainment Areas | 2/15/23 | 7/23/2024, 89 FR 59622 | List of nonattainment areas revised to include Giles County locality for the primary sulfur dioxide standard. |
5-20-205 | Prevention of Significant Deterioration
Areas | 1/1/98, 4/1/98, 1/1/99, 8/25/04 | 8/18/06, 71 FR 47744 | |
5-20-206 | Volatile Organic Compound and Nitrogen Oxides Emissions Control Areas | 10/4/06 | 3/2/07, 72 FR 9441 | Addition of new Fredericksburg Area and expansion of Richmond and Hampton Roads Emission Control Areas. |
5-20-220 | Shutdown of a stationary source | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-20-230 | Certification of Documents | 4/1/98 | 6/27/03, 68 FR 38191 | |
VR120-02-02 | Establishment of Regulations and Orders | 2/1/85 | 2/25/93, 58 FR 11373 | EPA has informed VA that except for the Appeals rule, these provisions no longer need to be part of the SIP. VA has withdrawn 2/93 and 2/98 revisions to the Appeals rule from SIP review. Last substantive SIP change became State-effective on 8/6/79 [§ 52.2465(c)(55)]. |
VR120-02-04 | Hearings and Proceedings | 2/1/85 | 2/25/93, 58 FR 11373 | |
VR120-02-05A | Variances—General | 2/1/85 | 2/25/93, 58 FR 11373 | |
VR 2.05(b) | Variances—Fuel Emergency | 8/14/75 | 10/8/80, 45 FR 66792 | |
VR120-02-09 | Appeals | 2/1/85 | 2/25/93, 58 FR 11373 | |
VR120-02-12 | Procedural information and guidance | 2/1/85 | 2/25/93, 58 FR 11373 | |
Appendix E | Public Participation Guidelines | 2/1/85 | 2/25/93, 58 FR 11373 | |
Appendix F | Delegation of Authority | 2/1/85 | 2/25/93, 58 FR 11373 | |
5-30-10 | General | 9/8/04 | 3/3/06, 71 FR 10842 | |
5-30-15 | Reference Conditions | 5/22/13 | 10/25/13, 78 FR 63878 | Revised to include Section 5-30-67. |
5-30-30 | Sulfur Oxides (Sulfur Dioxide) | 5/25/11 | 2/3/12, 77 FR 5400 | Addition of paragraphs A.2 through A.4; revisions to paragraphs A.1, C. and D. |
5-30-40 | Carbon Monoxide | 9/8/04 | 3/3/06, 71 FR 10842 | |
5-30-50 | Ozone (1-hour) | 9/8/04 | 3/3/06, 71 FR 10842 | |
5-30-55 | Ozone (8-hour, 0.08 ppm) | 11/21/12 | 6/11/13, 78 FR 34915 | The 1997 8-hour ozone NAAQS for purposes of transportation conformity is revoked. |
5-30-56 | Ozone (8-hour, 0.075 ppm) | 6/24/09 | 1/18/11, 76 FR 2829 | Added section. |
5-30-57 | Ozone (8-hour, 0.070 ppm) | 6/1/2016 | 3/12/2018, 83 FR 10628 | |
5-30-60 | Particulate Matter (PM | 8/1/07 | 12/28/10, 75 FR 81477 | Removed PM |
5-30-65 | Particulate Matter (PM | 8/1/07 | 12/28/10, 75 FR 81477 | Removed PM |
5-30-66 | Particulate Matter (PM | 8/1/07 | 12/28/10, 75 FR 81477 | Added section. |
5-30-67 | Particulate Matter (PM | 5/22/13 | 10/25/13, 78 FR 63878 | Added Section. |
5-30-70 | Oxides of nitrogen with nitrogen oxide as the indicator | 8/18/10 | 6/22/11, 76 FR 36326 | Sections A., D., and E. are modified. Sections B., C., F., and G. are added. |
5-30-80 | Lead | 6/24/09 | 4/25/11, 76 FR 22814 | Revised section. |
5-40-10 | Applicability | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-40-20 (except paragraph A.4.) | Compliance | 12/12/07 | 2/24/10, 75 FR 8249 | Revisions to paragraph A.3. |
5-40-21 | Compliance Schedules | 7/1/97 | 4/21/00, 65 FR 21315 | Appendix N. |
5-40-22 | Interpretation of Emissions Standards Based on Process Weight-Rate Tables | 7/1/97 | 4/21/00, 65 FR 21315 | Appendix Q. |
5-40-30 | Emission Testing | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-40-40 | Monitoring | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-40-41 | Emission Monitoring Procedures for Existing Sources | 7/1/97 | 4/21/00, 65 FR 21315 | Appendix J. |
5-40-50 | Notification, Records and Reporting | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-40-60 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0101. |
5-40-70 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0102. |
5-40-80 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0103. |
5-40-90 | Standard for Fugitive Dust/Emissions | 2/1/03 | 4/29/05, 70 FR 22263 | |
5-40-100 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0105. |
5-40-110 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0106. |
5-40-120 | Waivers | 2/1/03 | 4/29/05, 70 FR 22263 | |
5-40-240 | Applicability and Designation of Affected Facility | 1/2/02 | 2/28/08, 73 FR 10670 | |
5-40-250 | Definitions | 12/15/06 | 1/19/11, 76 FR 3023 | Removal of “Reasonably available control technology” from 5-40-250C. |
5-40-260 | Standard for Particulate Matter(AQCR 1-6) | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0403. |
5-40-270 | Standard for Particulate Matter (AQCR 7) | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0404. |
5-40-280 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0405. |
5-40-320 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0409. |
5-40-330 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0410. |
5-40-360 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0413. |
5-40-370 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0414. |
5-40-380 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0415. |
5-40-390 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0416. |
5-40-400 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0417. |
5-40-410 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0418. |
5-40-420 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0419. |
5-40-430 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0501. |
5-40-440 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0502. |
4-40-450 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0503. |
5-40-460 | Control Technology Guidelines | 2/1/02 | 3/3/06, 71 FR 10838 | |
5-40-470 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0505. |
5-40-480 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0506. |
5-40-510 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0509. |
5-40-520 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0510. |
5-40-530 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0511. |
5-40-540 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0512. |
5-40-550 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0513. |
5-40-560 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0514. |
5-40-570 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0515. |
5-40-580 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0601. |
5-40-590 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0602. |
5-40-600 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0603. |
5-40-610 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0604. |
5-40-620 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0605. |
5-40-630 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0606. |
5-40-660 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0609. |
5-40-670 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0610. |
5-40-680 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0611. |
5-40-690 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0612. |
5-40-700 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0613. |
5-40-710 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0614. |
5-40-720 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0615. |
5-40-730 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0701. |
5-40-740 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0702. |
5-40-750 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0703. |
5-40-760 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0704. |
5-40-770 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0705. |
5-40-800 | Prohibition of Flue-Fed Incinerators | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0708. |
5-40-810 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0709. |
5-40-820 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0710. |
5-40-830 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0711. |
5-40-840 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0712. |
5-40-850 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0713. |
5-40-860 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0714. |
5-40-870 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0715. |
5-40-880 | Applicability and Designation of Affected Facility | 4/1/99 | 5/31/01, 66 FR 29495 | |
5-40-890 | Definitions | 4/1/99 | 5/31/01, 66 FR 29495 | |
5-40-900 | Standard for Particulate Matter | 4/1/99 | 5/31/01, 66 FR 29495 | |
5-40-910 | Emission Allocation System | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0804. |
5-40-920 | Determination of Collection Equipment Efficiency Factor | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0805. |
5-40-930 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0806. |
5-40-940 | Standard for Visible Emissions | 4/1/99 | 5/31/01, 66 FR 29495 | |
5-40-950 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0808. |
5-40-980 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0811. |
5-40-990 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0812. |
5-40-1000 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0813. |
5-40-1010 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0814. |
5-40-1020 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0815. |
5-40-1030 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0816. |
5-40-1040 | Permits | 4/1/99 | 5/31/01, 66 FR 29495 | |
5-40-1050 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0901. |
5-40-1060 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0902. |
5-40-1070 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0903. |
5-40-1080 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0904. |
5-40-1090 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0905. |
5-40-1100 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0906. |
5-40-1130 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0909. |
5-40-1140 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0910. |
5-40-1150 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0911. |
5-40-1160 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0912. |
5-40-1170 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0913. |
5-40-1180 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0914. |
5-40-1190 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-0915. |
5-40-1200 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1001. |
5-40-1210 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1002. |
5-40-1220 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1003. |
5-40-1230 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1004. |
5-40-1240 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1005. |
5-40-1270 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1008. |
5-40-1280 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1009. |
5-40-1290 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1010. |
5-40-1300 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1011. |
5-40-1310 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1012. |
5-40-1320 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1013. |
5-40-1330 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1014. |
5-40-1340 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1101. |
5-40-1350 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1102. |
5-40-1360 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1103. |
5-40-1370 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1104. |
5-40-1390 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1106. |
5-40-1400 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1107. |
5-40-1410 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1108. |
5-40-1420 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1109. |
5-40-1450 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1112. |
5-40-1460 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1113. |
5-40-1470 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1114. |
5-40-1480 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1115. |
5-40-1490 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1116. |
5-40-1500 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1117. |
5-40-1510 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1118. |
5-40-1520 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1201. |
5-40-1530 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1202. |
5-40-1540 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1203. |
5-40-1550 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1204. |
5-40-1560 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1205. |
5-40-1590 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1208. |
5-40-1600 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1209. |
5-40-1610 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1210. |
5-40-1620 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1211. |
5-40-1630 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1212. |
5-40-1640 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1213. |
5-40-1650 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1214. |
5-40-1660 | Applicability and Designation of Affected Facility | 4/1/99 | 10/19/07, 72 FR 59207 | |
5-40-1670 | Definitions of Cross recovery furnace, Kraft pulp mill, Lime kiln, Recovery furnace, Smelt dissolving tank | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1302 Remaining definitions are federally enforceable as part of the Section 111(d) plan for kraft pulp mills (see, § 62.11610). |
Definitions | 4/1/99 | 10/19/07, 72 FR 59207 | Added: Neutral sulfite semi chemical pulping operation, New design recovery furnace, Pulp and paper mill, Semi chemical pulping process; Straight kraft recovery furnace.
Revised: Cross recovery furnace. | |
5-40-1680 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1303. |
5-40-1700 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1305. |
5-40-1710 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1306. |
5-40-1720 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1307. |
5-40-1750 | Compliance | 4/1/99 | 10/19/07, 72 FR 59207 | |
5-40-1760 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1311. |
5-40-1770A | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1312A. |
5-40-1780A | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1313A. |
5-40-1790 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1314. |
5-40-1800 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1315. |
5-40-1810 | Permits | 4/1/99 | 10/19/07, 72 FR 59207 | |
5-40-1820 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1401. |
5-40-1830 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1402. |
5-40-1840 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1403. |
5-40-1850 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1404. |
5-40-1860 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1405. |
5-40-1890 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1408. |
5-40-1900 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1409. |
5-40-1910 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1410. |
5-40-1920 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1411. |
5-40-1930 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1412. |
5-40-1940 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1413. |
5-40-1950 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1414. |
5-40-1960 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1501. |
5-40-1970 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1502. |
5-40-1980 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1503. |
5-40-1990 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1504. |
5-40-2000 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1505. |
5-40-2030 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1508. |
5-40-2040 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1509. |
5-40-2050 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1510. |
5-40-2060 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1511. |
5-40-2070 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1512. |
5-40-2080 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1513. |
5-40-2090 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1514. |
5-40-2100 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1601. |
5-40-2110 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1602. |
5-40-2120 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1603. |
5-40-2130 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1604. |
5-40-2140 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1605. |
5-40-2150 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1606. |
5-40-2180 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1609. |
5-40-2190 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1610. |
5-40-2200 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1611. |
5-40-2210 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1612. |
5-40-2220 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1613. |
5-40-2230 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1614. |
5-40-2240 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1615. |
5-40-2250 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1701. |
5-40-2260 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1702. |
5-40-2270 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1703. |
5-40-2280 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1704. |
5-40-2290 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1705. |
5-40-2320 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1708. |
5-40-2330 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1709. |
5-40-2340 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1710. |
5-40-2350 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1711. |
5-40-2360 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1712. |
5-40-2370 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1713. |
5-40-2380 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1714. |
5-40-2390 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1801. |
5-40-2400 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1802. |
5-40-2410 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1803. |
5-40-2420 | Standard for Sulfur Oxides | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1804. |
5-40-2430 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1805. |
5-40-2440 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1806. |
5-40-2470 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1809. |
5-40-2480 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1810. |
5-40-2490 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1811. |
5-40-2500 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1812. |
5-40-2510 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1813. |
5-40-2520 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1814. |
5-40-2530 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1815. |
5-40-2540 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1901. |
5-40-2550 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1902. |
5-40-2560 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1903. |
5-40-2570 | Standard for Sulfur Oxides | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1904. |
5-40-2580 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1905. |
5-40-2590 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1906. |
5-40-2620 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1909. |
5-40-2630 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1910. |
5-40-2640 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1911. |
5-40-2650 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1912. |
5-40-2660 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1913. |
5-40-2670 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1914. |
5-40-2680 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-1915. |
5-40-2690 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2001. |
5-40-2700 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2002. |
5-40-2710 | Standard for Particulate Matter | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2003. |
5-40-2720 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2004. |
5-40-2730 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2005. |
5-40-2760 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2008. |
5-40-2770 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2009. |
5-40-2780 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2010. |
5-40-2790 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2011. |
5-40-2800 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2012. |
5-40-2810 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2013. |
5-40-2820 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2014. |
5-40-2830 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2101. |
5-40-2840 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2102. |
5-40-2850 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2103. |
5-40-2870 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2105. |
5-40-2880 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2106. |
5-40-2910 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2109. |
5-40-2920 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2110. |
5-40-2930 | Monitoring | 2/1/02 | 3/3/06, 71 FR 10838 | |
5-40-2940 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2112. |
5-40-2950 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2113. |
5-40-2960 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2114. |
5-40-2970 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2115. |
5-40-2980 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2201. |
5-40-2990 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2202. |
5-40-3000 | Standard for Sulfur Dioxide | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2203. |
5-40-3010 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2204. |
5-40-3020 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2205. |
5-40-3050 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2208. |
5-40-3060 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2209. |
5-40-3070 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2210. |
5-40-3080 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2211. |
5-40-3090 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 20-04-2212. |
5-40-3100 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2213. |
5-40-3110 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2214. |
5-40-3120 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2301. |
5-40-3130 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2302. |
5-40-3140 | Standard for Nitrogen Oxides | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2303. |
5-40-3150 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2304. |
5-40-3160 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2305. |
5-40-3190 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2308. |
5-40-3200 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2309. |
5-40-3210 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2310. |
5-40-3220 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2311. |
5-40-3230 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2312. |
5-40-3240 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2313. |
5-40-3250 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2314. |
5-40-3260 | Applicability and Designation of Affected Facility | 3/24/04 | 5/17/05, 70 FR 28215 | |
5-40-3270 | Definitions | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3280 | Standard for Volatile Organic Compounds | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3290 | Control Technology Guidelines | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3300 | Standard for Visible Emissions | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3310 | Standard for Fugitive Dust/Emissions | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3340 | Compliance | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3350 | Test Methods and Procedures | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3360 | Monitoring | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3370 | Notification, Records and Reporting | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3380 | Registration | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3390 | Facility and Control Equipment Maintenance or Malfunction | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3400 | Permits | 4/1/97 | 11/3/99, 64 FR 59635 | |
5-40-3410 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2501. |
5-40-3420 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2502. |
5-40-3430 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2503. |
5-40-3440 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2504. |
5-40-3450 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2505. |
5-40-3460 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2506. |
5-40-3490 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2509. |
5-40-3500 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2510. |
5-40-3510 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2511. |
5-40-3520 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2512. |
5-40-3530 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2513. |
5-40-3540 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2514. |
5-40-3550 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2515. |
5-40-3560 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2601. |
5-40-3570 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2602. |
5-40-3580 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2603. |
5-40-3590 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2604. |
5-40-3600 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2605. |
5-40-3610 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2606. |
5-40-3640 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2609. |
5-40-3650 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2610. |
5-40-3660 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2611. |
5-40-3670 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2612. |
5-40-3680 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2613. |
5-40-3690 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2614. |
5-40-3700 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2615. |
5-40-3710 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2701. |
5-40-3720 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2702. |
5-40-3730 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2703. |
5-40-3740 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2704. |
5-40-3750 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2705. |
5-40-3760 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2706. |
5-40-3790 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2709. |
5-40-3800 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2710. |
5-40-3810 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2711. |
5-40-3820 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2712. |
5-40-3830 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2713. |
5-40-3840 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2714. |
5-40-3850 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2715. |
5-40-3860 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2801. |
5-40-3870 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2802. |
5-40-3880 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2803. |
5-40-3890 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2804. |
5-40-3900 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2805. |
5-40-3910 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2806. |
5-40-3940 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2809. |
5-40-3950 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2810. |
5-40-3960 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2811. |
5-40-3970 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2812. |
5-40-3980 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2813. |
5-40-3990 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2814. |
5-40-4000 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2815. |
5-40-4010 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2901. |
5-40-4020 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2902. |
5-40-4030 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2903. |
5-40-4040 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2904. |
5-40-4050 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2905. |
5-40-4060 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2906. |
5-40-4090 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2909. |
5-40-4100 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2910. |
5-40-4110 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2911. |
5-40-4120 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2912. |
5-40-4130 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2913. |
5-40-4140 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2914. |
5-40-4150 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-2915. |
5-40-4160 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3001. |
5-40-4170 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3002. |
5-40-4180 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3003. |
5-40-4190 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3004. |
5-40-4200 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3005. |
5-40-4210 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3006. |
5-40-4240 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3009. |
5-40-4250 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3010. |
5-40-4260 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3011. |
5-40-4270 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3012. |
5-40-4280 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3013. |
5-40-4290 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3014. |
5-40-4300 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3015. |
5-40-4310 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3101. |
5-40-4320 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3102. |
5-40-4330 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3103. |
5-40-4340 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3104. |
5-40-4350 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3105. |
5-40-4360 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3106. |
5-40-4390 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3109. |
5-40-4400 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3110. |
5-40-4410 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3111. |
5-40-4420 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3112. |
5-40-4430 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3113. |
5-40-4440 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3114. |
5-40-4450 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3115. |
5-40-4460 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3201. |
5-40-4470 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3202. |
5-40-4480 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3203. |
5-40-4490 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3204. |
5-40-4500 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3205. |
5-40-4510 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3206. |
5-40-4540 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3209. |
5-40-4550 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3210. |
5-40-4560 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3211. |
5-40-4570 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3212. |
5-40-4580 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3213. |
5-40-4590 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3214. |
5-40-4600 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3215. |
5-40-4610 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3301. |
5-40-4620 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3302. |
5-40-4630 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3303. |
5-40-4640 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3304. |
5-40-4650 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3305. |
5-40-4660 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3306. |
5-40-4690 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3309. |
5-40-4700 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3310. |
5-40-4710 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3311. |
5-40-4720 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3312. |
5-40-4730 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3313. |
5-40-4740 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3314. |
5-40-4750 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3315. |
5-40-4760 | Applicability and Designation of Affected Facility | 2/1/16 | 10/21/16, 81 FR 72711 | Amended to refer Northern VA VOC emission control area to Article 59. |
5-40-4770 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3402. |
5-40-4780 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3403. |
5-40-4790 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3404. |
5-40-4800 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3405. |
5-40-4810 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3406. |
5-40-4840 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3409. |
5-40-4850 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3410. |
5-40-4860 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3411. |
5-40-4870 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3412. |
5-40-4880 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3413. |
5-40-4890 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3414. |
5-40-4900 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3415. |
5-40-4910 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3501. |
5-40-4920 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3502. |
5-40-4930 | Standard for Volatile Organic Compounds | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3503. |
5-40-4940 | Control Technology Guidelines | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3504. |
5-40-4950 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3505. |
5-40-4960 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3506. |
5-40-4990 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3509. |
5-40-5000 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3510. |
5-40-5010 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3511. |
5-40-5020 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3512. |
5-40-5030 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3513. |
5-40-5040 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3514. |
5-40-5050 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3515. |
5-40-5060 | Applicability and Designation of Affected Facility | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-5070 | Definitions | 4/1/96 | 3/12/97, 62 FR 11334 | § 52.2465(c)(113)(i)(B)(4). |
5-40-5080 | Standard for Volatile Organic Compounds | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5090 | Standard for Visible Emissions | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5100 | Standard for Fugitive Dust/Emissions | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5130 | Compliance | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5140 | Test Methods and Procedures | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5150 | Monitoring | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5160 | Notification, Records and Reporting | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5170 | Registration | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5180 | Facility and Control Equipment Maintenance or Malfunction | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5190 | Permits | 4/1/96 | 3/12/97, 62 FR 11334 | |
5-40-5200 | Applicability and Designation of Affected Facility | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-5210 | Definitions | 2/1/02 | 3/3/06, 71 FR 10838 | |
5-40-5220 | Standard for Volatile Organic Compounds | 07/30/2015 | 05/10/2017, 82 FR 21702 | |
5-40-5230 | Control Technology Guidelines | 2/1/02 | 3/3/06, 71 FR 10838 | |
5-40-5240 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3705. |
5-40-5250 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3706. |
5-40-5270 | Standard for Toxic Pollutants | 07/30/2015 | 05/10/2017, 82 FR 21702 | |
5-40-5280 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3709. |
5-40-5290 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3710. |
5-40-5300 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3711. |
5-40-5310 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3712. |
5-40-5320 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3713. |
5-40-5330 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3714. |
5-40-5340 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-3715. |
5-40-5650 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-4101. |
5-40-5660 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-4102. |
5-40-5670 | Motor Vehicles | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-4103. |
5-40-5680 | Other Mobile Sources | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-4104. |
5-40-5690 | Export/Import of Motor Vehicles | 4/17/95 | 4/21/00, 65 FR 21315 | 120-04-4105. |
5-40-5800 | Applicability and Designation of Affected Facility | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5810 | Definitions | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-40-5820 | Standard for air emissions | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-40-5822 | Operational standards for collection and control systems | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5824 | Specifications for active collection systems | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5850 | Compliance | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-40-5855 | Compliance schedule | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5860 | Test methods and procedures | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5870 | Monitoring | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5880 | Reporting | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-40-5890 | Recordkeeping | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5900 | Registration | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5910 | Facility and control equipment Maintenance or Malfunction | 1/29/04 | 12/29/04, 69 FR 77900 | |
5-40-5920 | Permits | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-40-6820 | Applicability | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6830 | Definitions | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6840 | Standards for volatile organic compounds | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6850 | Standard for visible emissions | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6860 | Standard for fugitive dust/emissions | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6890 | Compliance | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6900 | Compliance schedules | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6910 | Test methods and procedures | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6920 | Monitoring | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6930 | Notification, records and reporting | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6940 | Registration | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6950 | Facility and control equipment Maintenance or Malfunction | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6960 | Permits | 3/24/04 | 6/9/04, 69 FR 32277 | |
5-40-6970 | Applicability and designation of affected facility | 10/1/13 | 8/4/15, 80 FR 46202 | Revision extends the applicability to include the Richmond VOC Emissions Control Area. |
5-40-6975 | Exemptions | 10/1/13 | 8/4/15, 80 FR 46202 | Added. |
5-40-6980 | Definitions | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-6990 | Standards for volatile organic compounds | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7000 | Standard for visible emissions | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7010 | Standard for fugitive dust/emissions | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7040 | Compliance | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7050 | Compliance schedules | 8/4/15, 80 FR 46202 | Amended. | |
5-40-7060 | Test methods and procedures | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7070 | Monitoring | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7080 | Notification, records and reporting | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7090 | Registration | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7100 | Facility and control equipment Maintenance or Malfunction | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7110 | Permits | 3/24/04 | 6/24/04, 69 FR 35253 | |
5-40-7370 | Applicability and designation of affected facility | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7380 | Definitions | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7390 | Standard for volatile organic compounds (1-hour ozone standard) | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7400 | Standard for volatile organic compounds (eight-hour ozone standard) | 12/02/2015 | 8/16/2016, 81 FR 54509 | Notification and compliance dates added |
5-40-7410 | Standard for nitrogen oxides (1-hour ozone standard) | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7420 | Standard for nitrogen oxides (eight-hour ozone standard) | 12/02/2015 | 8/16/2016, 81 FR 54509 | Notification and compliance dates added |
5-40-7430 | Presumptive reasonably available control technology guidelines for stationary sources of nitrogen oxides | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7440 | Standard for visible emissions | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7450 | Standard for fugitive dust/emissions | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7480 | Compliance | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7490 | Test methods and procedures | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7500 | Monitoring | 12/15/06 | 1/19/11 , 76 FR 3023 | Added Regulation. |
5-40-7510 | Notification | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7520 | Registration | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7530 | Facility and control equipment maintenance or malfunction | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation. |
5-40-7540 | Permits | 12/15/06 | 1/19/11, 76 FR 3023 | Added Regulation |
5-40-7800 | Applicability and Designation of Affected Facility | 2/1/16 | 10/21/16, 81 FR 72711 | Amended to refer Northern VA VOC emission control area to Article 56.1. |
5-40-7810 | Definitions of Alcohol, Cleaning solution, Fountain solution, Lithographic printing, Printing process | 4/1/96, 10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7820 | Standard for Volatile Organic Compounds | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7840 | Standard for Visible Emissions | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7850 | Standard for Fugitive Dust Emissions | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7880 | Compliance | 10/4/06 | 3/2/07, 72 FR 9441 | Revisions to compliance dates. |
5-40-7890 | Test Methods and Procedures | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7900 | Monitoring | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7910 | Notification, Records and Reporting | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7920 | Registration | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7930 | Facility and Control Equipment Maintenance and Malfunction | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-7940 | Permits | 4/1/96
10/4/06 | 3/2/07, 72 FR 9441 | |
5-40-8380 | Applicability and Designation of Affected Facility | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8382 | Definitions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8384 | Standard for volatile organic compounds | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8386 | Standard for visible emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8388 | Standard for fugitive/dust emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8396 | Compliance | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8398 | Compliance schedule | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8400 | Test methods and procedures | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8410 | Monitoring | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8412 | Notification, records, and reporting | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8414 | Registration | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8416 | Facility and control equipment maintenance or malfunction | 2/1/2016 | 6/22/2023, 88 FR 40718 | Added. |
5-40-8418 | Permits | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8420 | Applicability and Designation of Affected Facility | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8422 | Definitions | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8424 | Standard for volatile organic compounds | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8426 | Standard for visible emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8428 | Standard for fugitive/dust emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8434 | Compliance | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8436 | Compliance schedule | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8438 | Test methods and procedures | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8440 | Monitoring | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8450 | Notification, records, and reporting | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8460 | Registration | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8470 | Facility and control equipment maintenance or malfunction | 2/1/2016 | 6/22/2023,88 FR 40718 | Added. |
5-40-8480 | Permits | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8510 | Applicability and Designation of Affected Facility | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8520 | Definitions | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8530 | Standard for volatile organic compounds | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8540 | Standard for visible emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8550 | Standard for fugitive/dust emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8580 | Compliance | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8590 | Compliance schedule | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8600 | Test methods and procedures | 2/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8610 | Monitoring | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8620 | Notification, records, and reporting | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8630 | Registration | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8640 | Facility and control equipment maintenance or malfunction | 2/1/2016 | 7/20/2023, FR 46691 | Added. |
5-40-8650 | Permits | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8660 | Applicability and Designation of Affected Facility | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8670 | Definitions | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8680 | Standard for volatile organic compounds | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8690 | Standard for visible emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8700 | Standard for fugitive/dust emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8730 | Compliance | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8740 | Compliance schedule | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8750 | Test methods and procedures | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8760 | Monitoring | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8770 | Notification, records, and reporting | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8780 | Registration | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8790 | Facility and control equipment maintenance or malfunction | 2/1/2016 | 6/22/2023, 88 FR 40718 | Added. |
5-40-8800 | Permits | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8810 | Applicability and Designation of Affected Facility | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8820 | Definitions | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8830 | Standard for volatile organic compounds | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8840 | Standard for visible emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8850 | Standard for fugitive/dust emissions | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8880 | Compliance | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8890 | Compliance schedule | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8900 | Test methods and procedures | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8910 | Monitoring | 02/01/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8920 | Notification, records, and reporting | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8930 | Registration | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-40-8940 | Facility and control equipment maintenance or malfunction | 2/1/2016 | 6/22/2023, 88 FR 40718 | Added. |
5-40-8950 | Permits | 2/1/16 | 10/21/16, 81 FR 72711 | Added. |
5-45-10 | Applicability | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-20 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-30 | Emission testing | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-40 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-50 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-60 | Applicability | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-70 | Exemptions | 8/4/15, 80 FR 46202 | Amended. | |
5-45-80 | Definitions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-90 | Standard for volatile organic compounds | 8/4/15 | Amended. | |
5-45-100 | Administrative requirements | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-110 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-120 | Compliance schedules | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-130 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-140 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-150 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-160 | Applicability | 8/4/15, 80 FR 46202 | Revision extends the applicability to include the Richmond VOC Emissions Control Area. | |
5-45-170 | Exemptions | 8/4/15, 80 FR 46202 | Amended. | |
5-45-180 | Definitions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-190 | Standard for volatile organic compounds | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-200 | Certification procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-210 | Innovative products | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-220 | Administrative requirements | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-230 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-240 | Compliance schedules | 8/4/15, 80 FR 46202 | Amended. | |
5-45-250 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-260 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-270 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-280 | Applicability | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-290 | Exemptions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-300 | Definitions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-310
(Except for subsection B) | Standard for volatile organic compounds | 8/4/15, 80 FR 46202 | Amended. | |
5-45-320 | Alternative control plan (ACP) for consumer products | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-330 | Innovative products | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-340 | Administrative requirements | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-350 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-360 | Compliance schedules | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-370 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-380 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-390 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-400 | Applicability | 8/4/15, 80 FR 46202 | Revision extends the applicability to include the Richmond VOC Emissions Control Area. | |
5-45-410 | Exemptions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-420 | Definitions | 8/4/15, 80 FR 46202 | Amended. | |
5-45-430
(Except for subsection B) | Standard for volatile organic compounds | 8/4/15, 80 FR 46202 | Amended. | |
5-45-440 | Alternative control plan (ACP) for consumer products | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-450 | Innovative products | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-460 | Administrative requirements | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-470 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-480 | Compliance schedules | 8/4/15, 80 FR 46202 | Amended. | |
5-45-490 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-500 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-510 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-520 | Applicability | 8/4/15, 80 FR 46202 | Revision extends the applicability to include the Richmond VOC Emissions Control Area. | |
5-45-530 | Exemptions | 8/4/15, 80 FR 46202 | Amended. | |
5-45-540 | Definitions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-550 | Standard for volatile organic compounds | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-560 | Administrative requirements | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-570 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-580 | Compliance schedules | 8/4/15, 80 FR 46202 | Amended. | |
5-45-590 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-600 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-610 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-620 | Applicability | 8/4/15, 80 FR 46202 | Revision extends the applicability to include the Richmond VOC Emissions Control Area. | |
5-45-630 | Exemptions | 8/4/15, 80 FR 46202 | Amended. | |
5-45-640 | Definitions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-650 | Standard for volatile organic compounds | 8/4/15, 80 FR 46202 | Amended. | |
5-45-660 | Control technology guidelines | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-670 | Standard for visible emissions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-680 | Administrative requirements | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-690 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-700 | Compliance schedules | 8/4/15, 80 FR 46202 | Amended. | |
5-45-710 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-720 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-730 | Notification, records and reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-740 | Registration | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-750 | Facility and control equipment maintenance or malfunction | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-760 | Applicability | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-770 | Definitions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-780 | Standard for volatile organic compounds | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-790 | Standard for visible emissions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-800 | Standard for fugitive dust/emissions | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-820 | Compliance | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-830 | Test methods and procedures | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-840 | Monitoring | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-45-850 | Notification, records and
reporting | 3/17/10 | 1/26/2012, 77 FR 3928 | Added. |
5-50-10 | Applicability | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-50-20 | Compliance | 12/12/07 | 2/24/10, 75 FR 8249 | Revisions to paragraph A.3 . |
5-50-30 | Performance Testing | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-50-40 | Monitoring | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-50-50 | Notification, Records and Reporting | 8/1/02 | 3/15/04, 69 FR 12074 | |
5-50-60 | Applicability and Designation of Affected Facility | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0101. |
5-50-70 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0102. |
5-50-80 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0103. |
5-50-90 | Standard for Fugitive Dust/Emissions | 2/1/03 | 4/29/05, 70 FR 22263 | |
5-50-100 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0105. |
5-50-110 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0106. |
5-50-120 | Waivers | 2/1/03 | 4/29/05, 70 FR 22263 | |
5-50-240 | Applicability and designation of affected facility | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraphs A and C are revised. |
5-50-250 | Definitions | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraphs A-C are revised. |
5-50-260 | Standards for stationary sources | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraphs A-D are revised. |
5-50-270 | Standard for Major Stationary Sources (Nonattainment Areas) | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-50-280 | Standard for Stationary Sources (Prevention of Significant Deterioration Areas) | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-50-290 | Standard for Visible Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0406. |
5-50-300 | Standard for Fugitive Dust/Emissions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0407. |
5-50-330 | Compliance | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0410. |
5-50-340 | Test Methods and Procedures | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0411. |
5-50-350 | Monitoring | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0412. |
5-50-360 | Notification, Records and Reporting | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0413. |
5-50-370 | Registration | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0414. |
5-50-380 | Facility and Control Equipment Maintenance or Malfunction | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0415. |
5-50-390 | Permits | 4/17/95 | 4/21/00, 65 FR 21315 | 120-05-0416. |
5-70-10 | Applicability | 4/17/95 | 4/21/00, 65 FR 21315 | 120-07-01. |
5-70-20 | Definitions | 4/17/95 | 4/21/00, 65 FR 21315 | 120-07-02. |
5-70-30 | General | 4/17/95 | 4/21/00, 65 FR 21315 | 120-07-03. |
5-70-40 | Episode Determination | 4/1/99 | 10/19/0065 FR 62626 | References to TSP have been removed. |
5-70-50 | Standby Emission Reduction Plans | 4/17/95 | 4/21/00, 65 FR 21315 | 120-07-05. |
5-70-60 | Control Requirements | 4/17/95 | 4/21/00, 65 FR 21315 | 120-07-06. |
5-70-70 | Local Air Pollution Control Agency Participation | 4/17/95 | 4/21/00, 65 FR 21315 | 120-07-07. |
5-80-800 | Applicability | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-810 | Definitions | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-820 | General | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-830 | Applications | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-840 | Application information required | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-850 | Standards and conditions for granting Permits | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-860 | Action on permit application | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-870 | Application review and analysis | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-880 | Compliance determination and verification by testing | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-890 | Monitoring requirements | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-900 | Reporting requirements | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-910 | Existence of permits no defense | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-920 | Circumvention | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-930 | Compliance with local zoning requirements | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-940 | Transfer of Permits | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-950 | Termination of Permits | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-960 | Changes to Permits | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-970 | Administrative permit amendments | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-980 | Minor permit amendments | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-990 | Significant permit amendments | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-1000 | Reopening for cause | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-1010 | Enforcement | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-1020 | Public participation | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-1030 | General Permits | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-1040 | Review and evaluation of article | 4/1/98 | 6/27/03, 68 FR 38191 | |
5-80-1100 | Applicability | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1105 | Permit Exemptions | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraph E is excluded. |
5-80-1110 | Definitions | 3/27/14 | 8/23/16, 81 FR 57468 | |
5-80-1120 | General | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1130 | Reserved | Excluded from SIP. | ||
5-80-1140 | Applications | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1150 | Application information required | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1160 | Action on permit application | 11/7/12 | 8/22/16, 81 FR 56511 | The latter portion of paragraph D (beginning with “. . . direct consideration by the board . . .”) is excluded. |
5-80-1170 | Public participation | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraphs F and G are excluded. |
5-80-1180 | Standards and conditions for granting permits | 11/7/12 | 8/22/16, 81 FR 56511 | The portion of paragraph A.1 pertaining to hazardous air pollutant sources as proscribed under 9VAC5-60 is excluded. |
5-80-1190 | Application review and analysis | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraph 2 is excluded. |
5-80-1200 | Compliance determination and verification by performance testing | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1210 | Permit invalidation, suspension, revocation and enforcement | 11/7/12 | 8/22/16, 81 FR 56511 | Paragraph B is excluded. |
5-80-1220 | Existence of permit no defense | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1230 | Compliance with local zoning | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1240 | Transfer of permits | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1250 | General permits | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1260 | Action to combine permit terms and conditions | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1270 | Actions to change permits | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1280 | Administrative permit amendments | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1290 | Minor permit amendments | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1300 | Significant amendment procedures | 11/7/12 | 8/22/16, 81 FR 56511 | |
5-80-1605 | Applicability | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1615 | Definitions | 8/13/15 | 8/28/17, 82 FR 40707 | |
5-80-1625 | General | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1635 | Ambient Air Increments | 8/17/11 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1645 | Ambient Air Ceilings | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1655 | Applications | 9/1/06 | 8/28/17,82 FR 40707 | Previous approval 10/22/08. |
5-80-1665 | Compliance with local zoning requirements | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1675 | Compliance determination and verification by performance testing | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1685 | Stack Heights | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1695 | Exemptions | 6/4/14 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1705 | Control technology review | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1715 | Source impact analysis | 6/4/14 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1725 | Air quality models | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1735 | Air quality analysis | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1745 | Source Information | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1755 | Additional impact analysis | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1765 | Sources affecting Federal class I areas—additional requirements | 8/17/11 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1775 | Public participation | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1785 | Source obligation | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1795 | Environmental impact statements | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1805 | Disputed permits | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1815 | Interstate pollution abatement | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1825 | Innovative control technology | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1865 | Actuals plantwide applicability (PAL) | 8/13/15 | 8/28/17, 82 FR 40707 | |
5-80-1915 | Actions to combine permit terms and conditions | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1925 | Actions to change permits | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1935 | Administrative permit amendments | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1945 | Minor permit amendments | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1955 | Significant amendment procedures | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1965 | Reopening for cause | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1975 | Transfer of permits | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1985 | Permit invalidation, revocation, and enforcement | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-1995 | Existence of permit no defense | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2000 | Applicability | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2010 | Definitions | 8/13/15 | 8/28/17, 82 FR 40707 | Paragraph C is revised, except that under subdivision b of the definition of “baseline actual emissions,” the sentence stating, “The board shall allow the use of another time period upon a determination that it is more representative of normal source operation,” is not in the SIP. |
5-80-2020 | General | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2030 | Applications | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2040 | Application information required | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2050 | Standards and conditions for granting permits | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2060 | Action on permit application | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2070 | Public participation | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2080 | Compliance determination and verification by performance testing | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2090 | Application review and analysis | 5/1/02
9/01/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2091 | Source obligation | 9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2110 | Interstate Pollution Abatement | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2120 | Offsets | 8/17/11 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2130 | De minimis increases and stationary source modification alternatives for ozone nonattainment areas classified as serious or severe in 9 VAC 5-20-204 | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2140 | Exemptions | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2144 | Actuals plantwide applicability limits (PALs) | 8/13/15 | 8/28/17, 82 FR 40707 | |
5-80-2150 | Compliance with local zoning requirements | 5/1/02
9/01/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2170 | Transfer of permits | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2180 | Permit invalidation, revocation, and enforcement | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2190 | Existence of permit no defense | 5/1/02
9/1/06 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2195 | Actins to combine permit terms and conditions | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2200 | Actions to change permits | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2210 | Administrative permit amendments | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2220 | Minor permit amendments | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2230 | Significant amendment procedures | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-80-2240 | Reopening for cause | 7/23/09 | 8/28/17, 82 FR 40707 | Previous approval 10/22/08. |
5-85-10 | Applicability | 1/2/11 | 5/13/11, 76 FR 27898 | |
5-85-40 | Prevention of Significant Deterioration Area Permit Actions | 03/13/14 | 11/23/15 11/23/15; 80 FR 72905 | |
5-85-50 | Definitions | 8/13/15 | 8/28/17, 82 FR 40707 | |
5-85-55 | Actuals Plantwide applicability limits (PALs) | 8/13/15 | 8/28/17, 82 FR 40707 | |
5-85-55 | Actual plantwide applicability limits (PALs) | 03/13/14 | 11/23/1511/23/15; 80 FR 72905 | Added. |
5-85-60 | State Operating Permit Actions | 1/2/11 | 5/13/11, 76 FR 27898 | |
5-85-70 | Definitions | 1/2/11 | 5/13/11, 76 FR 27898 | |
5-91-10 | General | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-20 | Terms defined | 1/24/97 | 9/1/99, 64 FR 47670 | Exception—“Northern Virginia program area” does not include Fauquier County, Effective 1/1/98. |
6/29/05 | 4/22/08, 73 FR 21540 | |||
5-91-30 | Applicability and authority of the department | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-50 | Documents incorporated by reference | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-70 | Appeal of case decisions | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-90 | Right of entry | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-100 | Conditions on approvals | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-120 | Export and import of motor vehicles | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-130 | Relationship of state regulations to Federal regulations | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-140 | Delegation of authority | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-150 | Availability of information | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-160 | Exhaust emission standards for two-speed idle testing in enhanced emissions inspection programs | 6/29/05 | 4/22/08, 73 FR 21540 | |
5-91-170 | Exhaust emission standards for ASM testing in enhanced emissions inspection programs | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-180 | Exhaust emission standards for on-road testing through remote sensing | 6/29/05 | 4/22/08, 73 FR 21540 | |
5-91-190 | Emissions control system standards | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-200 | Evaporative emissions standards | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-210 | Visible emissions standards | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-220 | General provisions | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-230 | Applications | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-240 | Standards and conditions for permits | 1/27/97 | 9/1/99, 64 FR 47670 | |
5-91-250 | Action on permit application | 1/27/97 | 9/1/99, 64 FR 47670 | |
5-91-260 | Emissions inspection station permits, categories | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-270 | Permit renewals | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-280 | Permit revocation, surrender of materials | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-290 | Emissions inspection station operations | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-300 | Emissions inspection station records | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-310 | Sign and permit posting | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-320 | Equipment and facility requirements | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-330 | Analyzer system operation | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-340 | Motor vehicle inspection report; certificate of emissions inspection | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-350 | Data media | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-360 | Inspector identification number and access code usage | 10/1/02 | 4/22/08, 73 FR 21540 | Retitled and amended. |
5-91-370 | Fleet emissions inspection stations; mobile fleet inspection stations | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-380 | Emissions inspector licenses and renewals | 10/21/02 | 4/22/08, 73 FR 21540 | |
5-91-390 | Qualification requirements for emissions inspector licenses | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-400 | Conduct of emissions inspectors | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-410 | General | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-420 | Inspection procedure; rejection, pass, fail, waiver | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-430 | ASM test procedure | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-440 | Two-speed idle test procedure | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-450 | Evaporative system pressure test and gas cap pressure test procedure | 10/1/02 | 4/22/08, 73 FR 21540 | Retitled and amended. |
5-91-480 | Emissions related repairs | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-490 | Engine and fuel changes | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-500 | Applicability and authority | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-90-510 | Certification qualifications | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-520 | Expiration, reinstatement, renewal, and requalification | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-530 | Emissions and repair facility operations | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-540 | Sign and certificate posting | 10/1/02 | 4/22/08, 73 FR 21540 | Retitled and amended. |
5-91-550 | Applicability and authority | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-560 | Certification qualifications for emissions repair technicians | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-570 | Expiration, reinstatement, renewal and requalification | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-580 | Certified emissions repair technician responsibilities | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-590 | Enforcement of regulations, permits, licenses, certifications and orders | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-600 | General enforcement process | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-610 | Consent orders and penalties for violations | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-620 | Major violations | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-630 | Minor violations | 4/2/97 | 9/1/99, 64 FR 47670 | |
5-91-640 | Applicability | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-650 | Design goals | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-660 | Warranty; service contract | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-670 | Owner-provided services | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-680 | Certification of analyzer systems | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-690 | Span gases; gases for calibration purposes | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-700 | Calibration of exhaust gas analyzers | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-710 | Upgrade of analyzer system | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-720 | Vehicle manufacturers recall | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-730 | Exemptions; temporary extensions | 1/24/97 | 9/1/99, 64 FR 47670 | |
5-91-740 | General requirements | 6/29/05 | 4/22/08, 73 FR 21540 | |
5-91-750 | Operating procedures; violation of standards | 6/29/05 | 4/22/08, 73 FR 21540 | |
5-91-760 | Schedule of civil charges | 6/29/05 | 4/22/08, 73 FR 21540 | |
5-91-790 | ASM start-up standards | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-91-800 | ASM final standards | 10/1/02 | 4/22/08, 73 FR 21540 | |
5-130-10 | Applicability | 3/18/09 | 3/14/11, 76 FR 13511 | Formerly 5-40-5600
Provisions of this Chapter expanded to new localities in the emissions control areas. |
5-130-20 | Definitions | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-130-30 | Open Burning Prohibitions | 3/18/09 | 3/14/11, 76 FR 13511 | Formerly 5-40-5620. |
5-130-40 | Permissible open burning | 8/17/11 | 6/1/12 by Letter Notice | The SIP effective date is 6/1/12. |
5-130-50 | Forest Management and Agricultural Practices | 3/18/09 | 3/14/11, 76 FR 13511 | Formerly 5-40-5631. |
5-140-10 | Purpose | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-20 | Definitions | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-30 | Measurements, abbreviations, and acronyms | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-31 | Federal Regulations Incorporated by reference | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-40 | Applicability | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-50 | Retired unit exemption | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-60 | Standard requirements | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-70 | Computation of time | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-100 | Authorization and responsibilities of the NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-110 | Alternate NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-120 | Changing the NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-130 | Account certificate of representation | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-140 | Objections concerning the NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-200 | General NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-210 | Submission of NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-220 | Information requirements for NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-230 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-240 | Effective date of initial NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-250 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-300 | Compliance certification report | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-310 | Permitting authority's and administrator's actionon compliance certifications | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-400 | State trading program budget | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-410 | Timing requirements for NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-420 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-430 | Compliance Supplement Pool | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-500 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-510 | Establishment of accounts | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-520 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-530 | Recordation of NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-540 | Compliance | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-550 | Banking | 3/24/04 | 8/25/04, 69 FR 52174 | |
5-140-560 | Account error | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-570 | Closing of general accounts | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-600 | Scope and submission of NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-610 | EPA recordation | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-620 | Notification | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-700 | General Requirements | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-710 | Initial certification and recertification procedures | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-720 | Out of control periods | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-730 | Notifications | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-740 | Recordkeeping and reporting | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-750 | Petitions. | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-760 | Additional requirements to provide heat input data for allocation purposes | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-800 | Applicability | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-810 | General | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-820 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-830 | Applying for NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-840 | Opt-in process | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-850 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-860 | Withdrawal from NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-870 | Change in regulatory status | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-880 | NO | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-900 | State trading program budget | 12/31/08 | 11/7/11, 76 FR 68638 | Revise applicable year to 2004 and each year thereafter. |
5-140-910 | Compliance supplement pool budget | 7/17/02 | 7/8/03, 68 FR 40520 | |
5-140-920 | Total electric generating unit allocations | 12/31/08 | 11/7/11, 76 FR 68638 | Add subsection B, which extends the NO |
5-140-930 | Total non-electric generating unit allocations | 12/31/08 | 11/7/11, 76 FR 68638 | Add subsection B, which extends the NO |
5-151-10 | Definitions | 12/31/08 | 11/20/09, 74 FR 60194 | |
5-151-20 | Applicability | 12/31/08 | 11/20/09, 74 FR 60194 | |
5-151-30 | Authority of Board and DEQ | 12/31/08 | 11/20/09, 74 FR 60194 | |
5-151-40 | General | 8/15/12 | 4/1/13, 78 FR 19421 | |
5-151-50 | Designated provisions | 12/31/08 | 11/20/09, 74 FR 60194 | |
5-151-60 | Word or phrase substitutions | 12/31/08 | 11/20/09, 74 FR 60194 | |
5-151-70 | Consultation | 8/15/12 | 4/1/13, 78 FR 19421 | Section D.1.f. is amended. |
5-160-10 | General | 1/1/98 | 1/7/03, 68 FR 663. | |
5-160-20 | Terms defined | 3/2/11 | 12/12/11, 76 FR 77150 | Number of terms added—10.
Number of terms revised—11. Number of Terms deleted—2. |
5-160-30 | Applicability | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-40 | Authority of board and department | 1/1/97 | 10/21/97, 62 FR 54585 | |
5-160-80 | Relationship of state regulations to Federal regulations | 1/1/97 | 10/21/97, 62 FR 54585 | |
5-160-110 | General | 3/2/11 | 12/12/2011, 76 FR 77150 | |
5-160-120 | Federal agency conformity responsibility | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-130 | Reporting requirements | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-140 | Public participation | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-150 | Reevaluation of conformity | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-160 | Criteria for determining conformity of general conformity actions | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-170 | Procedures for conformity determinations | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-180 | Mitigation of air quality impacts | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-181 | Conformity evaluation for federal installations with facility-wide emission budgets | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-182 | Emissions beyond the time period covered by the applicable implementation plan | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-183 | Timing of offsets and mitigation measures | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-184 | Inter-precursor mitigation measures and offsets | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-185 | Early emission reduction credit programs at federal facilities and installation subject to federal oversight | 3/2/11 | 12/12/11, 76 FR 77150 | |
5-160-190 | Savings provision | 1/1/97 | 10/21/97, 62 FR 54585 | |
5-170-10 | Use of Terms | 1/1/98 | 1/7/03, 68 FR 663 | Split out from 9 VAC 5-10-10. |
5-170-20 | Terms Defined | 11/19/14 | 4/2/15, 80 FR 17695 | Docket #2015-0040. Revised to add the terms disclosure form and potential conflict of interest. |
5-170-30 | Applicability | 1/1/98 | 1/7/03, 68 FR 663 | Split out from 9 VAC 5-20-10. |
5-170-60 | Availability of Information | 1/1/98 | 1/7/03, 68 FR 663 | Replaces 9 VAC 5-20-150 and 5-160-100. |
5-170-120A.-C. | Enforcement of Regulations, Permits and Orders | 1/1/98 | 1/7/03, 68 FR 663 | Replaces 9 VAC 5-20-30A. D. and 5-160-60. |
5-170-130A. | Right of Entry | 1/1/98 | 1/7/03, 68 FR 663 | Replaces 9 VAC 5-20-100. |
5-170-150 | Local Ordinances | 1/1/98 | 1/7/03, 68 FR 663 | Replaces 9 VAC 5-20-60. |
5-170-160 | Conditions on Approvals | 1/1/98 | 1/7/03, 68 FR 663 | Replaces 9 VAC 5-20-110. |
5-170-170 | Considerations for Approval Actions | 1/1/98 | 1/7/03, 68 FR 663 | Replaces 9 VAC 5-20-140. |
5-170-210 | General | 11/19/14 | 80 FR 17695 | Docket #2015-0040. Does not include subsection B |
5-220-10 | Applicability and designation of affected facility | 12/1/02 | 9/4/09, 74 FR 45766 | |
5-220-20 | Definitions | 12/1/02 | 09/4/09, 74 FR 45766 | |
5-220-30 | Applicability of standard for visible emissions and standard for particulate matter | 12/1/02 | 9/4/09 , 74 FR 45766 | |
5-220-40 | Compliance determination, monitoring, recordkeeping, and reporting | 12/1/02 | 9/4/09, 74 FR 45766 | |
5-220-50 | Transfer of ownership | 12/1/02 | 9/4/09, 74 FR 45766 | |
5-220-60 | Applicability of future regulations | 12/1/02 | 9/4/09, 74 FR 45766 | |
5-230-10 | Applicability and designation of affected facility | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-20 | Definitions | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-30 | Authority to operate under this chapter and FESOP | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-40 (Except A.7., A.9., A.10., and B.2.) | Sitewide Emissions Caps | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-50 | New Source Review program and registration requirements | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-60 (Except A.1.) | Other regulatory requirements | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-70 | Federal Operating Permits | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-80 | FESOP issuance and amendments | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-90 | Transfer of ownership | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-110 | Termination of authority to operate under this chapter and FESOP | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-230-120 | Review and confirmation of this chapter by Board | 9/7/05 | 8/13/07, 72 FR 45165 | |
5-480-10 | Definitions | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 1. |
5-480-20 | Applicability | 11/1/96 | 2/17/00, 65 FR 8051 | |
5-480-30 | Minimum oxygenate content | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 3. |
5-480-40 | Nature of oxygenates | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 4. |
5-480-50 | Record keeping and transfer requirements | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 5. |
5-480-60 | Gasoline pump labeling | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 6. |
5-480-70 | Sampling, testing and oxygen content calculations | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 7. |
5-480-80 | Compliance and enforcement | 11/1/93 | 1/7/03, 68 FR 663 | VR115-04-28, § 8. |
Section 10.1-1302 | Qualifications of members of Boards | 7/1/08 | 10/11/11, 76 FR 62635 | Section added. |
Section 10.1-1316.1A. Through D | Severe ozone nonattainment areas; fees | 7/1/04 | 12/29/04, 69 FR 77909 | Provision authorizes the Department of Environmental Quality (DEQ) to collect Federal penalty fees from major stationary sources if the nonattainment area does not attain the ozone standard by the statutory attainment date. |
(d) EPA-Approved State Source Specific Requirements
EPA-Approved Source Specific Requirements
Source name | Permit/order or registration
number | State
effective date | EPA approval date | 40 CFR part 52 citation |
---|---|---|---|---|
Norfolk Naval Base-Exchange Service Station | [NONE] | 8/6/79 | 8/17/81, 46 FR 41499 | 52.2465(c)(41). |
Reynolds Metals Co.-Rolling Mill | DSE-597-87 | 9/30/87 | 8/20/90, 55 FR 33904 | 52.2465(c)(92). |
Aqualon (Hercules) Company | 50363 | 9/26/90 | 11/1/91, 56 FR 56159 | 52.2465(c)(93). |
Nabisco Brands, Inc | DTE-179-91 | 4/24/91 | 3/6/92, 57 FR 8080 | 52.2465(c)(95). |
Reynolds Metals Co.-Bellwood | 50260 | 10/20/2015 | 8/26/2016, 81 FR 58857 | 52.2465(c)(110). |
Reynolds Metals Co.-Richmond Foil Plant | DSE-412A-86 | 10/31/86 | 6/13/96, 61 FR 29963 | 52.2465(c)(110). |
Philip Morris, Inc.—Blended Leaf Facility | 50080 | 2/27/86 | 10/14/97, 62 FR 53242 | 52.2465(c)(120). |
Philip Morris, Inc.—Park 500 Facility | 50722 | 3/26/97 | 10/14/97, 62 FR 53242 | 52.2465(c)(120). |
Philip Morris, Inc.—Richmond Manufacturing Center | 50076 | 7/13/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(120). |
Virginia Electric and Power Co.—Innsbrook Technical Center | 50396 | 5/30/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(120). |
Hercules, Inc.-Aqualon Division | V-0163-96 | 7/12/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(120). |
City of Hopewell-Regional Wastewater Treatment Facility | 50735 | 5/30/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(120). |
Allied Signal, Inc.-Hopewell Plant | 50232 | 3/26/97 | 10/14/97, 62 FR 53242 | 52.2465(c)(121). |
Allied Signal, Inc.-Chesterfield Plant | V-0114-96 | 5/20/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(121). |
Bear Island Paper Co. L.P | V-0135-96 | 7/12/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(121). |
Stone Container Corp.—Hopewell Mill | 50370 | 5/30/96 | 10/14/97, 62 FR 53277 | 52.2465(c)(121). |
E.I. Dupont de Nemours and Co.—Spruance Plant | V-0117-96 | 5/30/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(121). |
ICI Americas Inc.—Films Division-Hopewell Site | 50418 | 5/30/96 | 10/14/97, 62 FR 53242 | 52.2465(c)(121). |
Tuscarora, Inc | 71814 | 6/5/96 | 1/22/99, 64 FR 3425 | 52.2465(c)(128). |
Virginia Power (VP)—(Possum Point Generating Station [Permit to Operate] | Registration No. 70225; County-Plant No. 153-0002 | 9/26/00 | 12/14/00, 65 FR 78100 | 52.2420(d)(2). |
Cellofoam North America, Inc.—Falmouth Plant [Consent Agreement] | Registration No. 40696; FSO-193-98 | 8/10/98 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
CNG Transmission Corporation—Leesburg Compressor Station [Permit to Operate] | Registration No. 71978; County-Plant No. 107-0101 | 5/22/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Columbia Gas Transmission Company—Loudoun County Compressor Station [Permit to Operate] | Registration No. 72265; County-Plant No. 107-0125 | 5/23/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
District of Columbia's Department of Corrections—Lorton Correctional Facility [Permit to Operate] | Registration No. 70028; County-Plant No. 0059-0024 | 12/10/99 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Michigan Cogeneration Systems, Inc.—Fairfax County I-95 Landfill [Permit to Operate] | Registration No. 71961; County-Plant No. 0059-0575 | 5/10/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3) |
Metropolitan Washington Airports Authority—Ronald Reagan Washington National Airport [Permit to Operate] | Registration No. 70005; County-Plant No. 0013-0015 | 5/22/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Noman M. Cole, Jr., Pollution Control Plant [Consent Agreement] | Registration No. 70714 | 12/13/99 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Ogden Martin Systems of Alexandria/Arlington, Inc. [Consent Agreement] | Registration No. 71895; NVRO-041-98 | 7/31/98 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Ogden Martin Systems of Fairfax, Inc. [Consent Agreement] | Registration No. 71920 | 4/3/98 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
U.S. Department of Defense—Pentagon Reservation [Permit to Operate] | Registration No. 70030; County-Plant No. 0013-0188 | 5/17/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
United States Marine Corps.—Quantico Base [Permit to Operate] | Registration No. 70267; County-Plant No. 153-0010. | 5/24/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Transcontinental Gas Pipeline Corporation—Compressor Station No.185 [Consent Agreement] | Registration No. 71958 | 9/5/96 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
U.S. Army Garrison at Fort Belvoir [Permit to Operate] | Registration No. 70550; County-Plant No. 059-0018 | 5/16/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Virginia Power (VP)—Possum Point Generating Station [Permit containing NO | Registration No. 70225; County-Plant No. 153-0002 | 7/21/00 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Virginia Electric and Power Company—Possum Point Generating Station [Consent Agreement containing VOC RACT requirements] | Registration No. 70225 | 6/12/95 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Washington Gas Light Company—Springfield Operations Center [Consent Agreement] | Registration No. 70151; NVRO-031-98 | 4/3/98 | 1/2/01, 66 FR 8. | 52.2420(d)(3). |
Georgia Pacific—Jarratt Softboard Plant | Registration No. 50253 | 9/28/98 | 3/26/03, 68 FR 14542 | 40 CFR 52.2420(d)(4); |
Prince William County Landfill | Registration No. 72340 | 4/16/04 | 9/9/04, 69 FR 54581 | 52.2420(d)(5). |
Washington Gas Company, Ravensworth Station | Registration No. 72277 | 4/16/04
8/11/04 | 10/6/04, 69 FR 59812 | 52.2420(d)(6). |
Central Intelligence Agency (CIA), George Bush Center for Intelligence | Registration No. 71757 | 4/16/04 | 12/13/04, 69 FR 72115 | 52.2420(d)(6). |
National Reconnaissance Office, Boeing Service Center | Registration No. 71988 | 4/16/04 | 12/13/04, 69 FR 72115 | 52.2420(d)(6). |
Roanoke Electric Steel Corporation D/B/A Steel Dynamics, Inc.—Roanoke Bar Division | 20131 | 3/25/20 | 6/9/21, 86 FR 30547 | 52.2420(d)(7). |
Roanoke Cement Company | Registration No. 20232 | 12/22/04 | 4/27/05, 70 FR 21621 | 52.2420(d)(7). |
Global Stone Chemstone Corporation | Registration No. 80504 | 2/9/05 | 4/27/05, 70 FR 21621 | 52. 2420(d)(7). |
Kraft Foods Global, Inc.—Richmond Bakery | Registration No. 50703 | 9/19/07 | 4/15/08, 73 FR 20175 | 52.2420(d)(8). |
Transcontinental Pipeline Station 165 | Registration No. 30864 | 1/24/07 | 10/30/08, 73 FR 64551 | 52.2420(d)(9). |
Transcontinental Pipeline Station 170 | Registration No. 30863 | 1/24/07 | 10/30/08, 73 FR 64551 | 52.2420(d)(9). |
Transcontinental Pipeline Station 180 | Registration No. 40782 | 2/13/07 | 10/30/08, 73 FR 64551 | 52.2420(d)(9). |
Roanoke Cement Corporation | Registration No. 20232 | 6/18/07 | 10/30/08, 73 FR 64551 | 52.2420(d)(9). |
Reynolds Consumer Products Company | Registration No. 50534 | 10/1/08 | 3/25/09, 74 FR 12572 | 52.2420(d)(12). The SIP effective date is 5/26/09. |
GP Big Island, LLC | Registration No. 30389 | 10/5/12 | 4/18/14, 79 FR 21855 | 52.2420(d); BART permit revised to reflect the unit shutdown; replaces permit dated 6/12/08. |
MeadWestvaco Corporation | Registration No. 20328 | 2/23/09
5/6/11 | 6/13/12
77 FR 35287 | § 52.2420(d); BART and Reasonable Progress determinations and permit. |
O-N Minerals Facility | Registration No. 80252 | 12/28/09
11/19/10 | 6/13/12
77 FR 35287 | § 52.2420(d); BART determination and permit. |
Mondelēz Global LLC, Inc.—Richmond Bakery | Registration No. 50703 | 2/14/14 | 4/29/14, 79 FR 23917 | 52.2420(d)(13). |
Virginia Electric and Power Company (VEPCO)—Possum Point Power Station | Registration No. 70225 | 01/31/19 | 12/09/19, 84 FR 67199 | § 52.2420(d); RACT for 2008 ozone NAAQS. |
Covanta Alexandria/Arlington, Inc | Registration No. 71920 | 02/14/19 | 12/09/19, 84 FR 67199 | § 52.2420(d); RACT for 2008 ozone NAAQS. |
Covanta Fairfax, Inc | Registration No. 71895 | 02/08/19 | 12/09/19, 84 FR 67199 | § 52.2420(d); RACT for 2008 ozone NAAQS. |
(e) EPA-approved non-regulatory and quasi-regulatory material.
(1) Non-regulatory material.
Name of non-regulatory
SIP revision | Applicable geographic area | State submittal date | EPA approval date | Additional explanation |
---|---|---|---|---|
Commitment Letter-Clean fuel fleet or alternative substitute program | Northern Virginia Ozone nonattainment Area | 1/25/93 | 9/23/93, 58 FR 50846 | 52.2423(j). |
Motor vehicle emissions budgets | Hampton Roads Ozone Maintenance Area | 8/29/96 | 6/26/97, 62 FR 34408 | 52.2424(a). |
Motor vehicle emissions budgets | Richmond Ozone Maintenance Area | 7/30/96 | 11/17/97, 62 FR 61237 | 52.2424(b). |
1990 Base Year Emissions Inventory-Carbon Monoxide (CO) | Metropolitan Washington Area | 11/1/93, 4/3/95, 10/12/95 | 1/30/96, 61 FR 2931 | 52.2425(a). |
1990 Base Year Emissions Inventory-Carbon Monoxide (CO), oxides of nitrogen (NO | Richmond-Petersburg, Norfolk-Virginia Beach, and Smyth County Ozone Areas | 11/11/92, 11/18/92, 11/1/93, 12/15/94 | 9/16/96, 61 FR 48657 | 52.2425(b). |
1990 Base Year Emissions Inventory-Carbon Monoxide (CO), oxides of nitrogen (NO | Northern Virginia (Metropolitan Washington) Ozone Nonattainment Area | 11/30/92, 11/1/93, 4/3/95 | 9/16/96, 61 FR 54656 | 52.2425(c). |
1990 Base Year Emissions Inventory-oxides of nitrogen (NO | Northern Virginia (Metropolitan Washington) Ozone Nonattainment Area | 12/17/97 | 7/8/98, 63 FR 36854. | |
Photochemical Assessment Monitoring Stations (PAMS) Program | Northern Virginia (Metropolitan Washington) Ozone Nonattainment Area | 11/15/94 | 9/11/95, 60 FR 47081 | 52.2426. |
Attainment determination of the ozone NAAQS | Richmond Ozone Nonattainment Area | 7/26/96 | 10/6/97, 62 FR 52029 | 52.2428(a). |
15% rate of progress plan | Northern Virginia (Metropolitan Washington) Ozone Nonattainment Area | 4/14/98 | 10/6/00, 65 FR 59727 | 52.2428(b). |
Small business stationary source technical and environmental assistance program | Statewide | 11/10/92 | 2/14/94, 59 FR 5327 | 52.2460. |
Establishment of Air Quality Monitoring Network | Statewide | 3/24/80 | 12/5/80, 45 FR 86530 | 52.2465(c)(38). |
Lead (Pb) SIP | Statewide | 12/31/80 | 3/21/82, 45 FR 8566 | 52.2465(c)(61). |
Carbon Monoxide Maintenance Plan | Arlington County & Alexandria City | 3/22/04 | 4/4/05, 70 FR 16958 | Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. |
Ozone Maintenance Plan, emissions inventory & contingency measures | Hampton Roads Area | 8/27/96 | 6/26/97, 62 FR 34408 | 52.2465(c)(117). |
Ozone Maintenance Plan, emissions inventory & contingency measures | Richmond Area | 7/26/96 | 11/17/97, 62 FR 61237 | 52.2465(c)(119). |
Non-Regulatory Voluntary Emission Reduction Program | Washington, DC severe 1-hour ozone nonattainment area | 2/25/04 | 5/12/05, 70 FR 24987 | The nonregulatory measures found in section 7.6 and Appendix J of the plan. |
1996-1999 Rate-of-Progress Plan SIP and the Transportation Control Measures (TCMs) in Appendix H | Washington 1-hour ozone nonattainment area | 12/29/03, 5/25/99 | 5/16/05, 70 FR 25688 | Only the TCMs in Appendix H of the 5/25/1999 revision, 1999 motor vehicle emissions budgets of 128.5 tons per day (tpy) of VOC and 196.4 tpy of NO |
1990 Base Year Inventory Revisions | Washington 1-hour ozone nonattainment area | 8/19/03, 2/25/04 | 5/16/05, 70 FR 25688. | |
1999-2005 Rate-of-Progress Plan SIP Revision and the Transportation Control Measures (TCMs) in Appendix J | Washington 1-hour ozone nonattainment area | 8/19/03, 2/25/04 | 5/16/05, 70 FR 25688 | Only the TCMs in Appendix J of the 2/25/2004 revision, 2002 motor vehicle emissions budgets (MVEBs) of 125.2 tons per day (tpy) for VOC and 290.3 tpy of NO |
VMT Offset SIP Revision | Washington 1-hour ozone nonattainment area | 8/19/03, 2/25/04 | 5/16/05, 70 FR 25688. | |
Contingency Measure Plan | Washington 1-hour ozone nonattainment area | 8/19/03, 2/25/04 | 5/16/05, 70 FR 25688. | |
1-hour Ozone Modeled Demonstration of Attainment and Attainment Plan | Washington 1-hour ozone nonattainment area | 8/19/03, 2/25/04 | 5/16/05, 70 FR 25688 | 2005 motor vehicle emissions budgets of 97.4 tons per day (tpy) for VOC and 234.7 tpy of NO |
3/18/14 | 5/26/15, 80 FR 29963 | Removal of Stage II vapor recovery program. See section 52.2428. | ||
Attainment Demonstration and Early Action Plan for the Roanoke MSA Ozone Early Action Compact Area | Botetourt County, Roanoke City, Roanoke County, and Salem City | 12/21/04, 2/15/05 | 8/17/05, 70 FR 43277. | |
Attainment Demonstration and Early Action Plan for the Northern Shenandoah Valley Ozone Early Action Compact Area | City of Winchester and Frederick County | 12/20/04, 2/15/05 | 8/17/05, 70 FR 43280. | |
8-Hour Ozone Maintenance Plan for the Fredericksburg VA Area | City of Fredericksburg, Spotsylvania County, and Stafford County | 5/4/05 | 12/23/05, 70 FR 76165. | |
3/18/14 | 5/26/15, 80 FR 29963 | Revised 2009 and 2015 motor vehicle emission budgets for NO | ||
8-Hour Ozone Maintenance Plan for the Madison & Page Cos. (Shenandoah NP), VA Area | Madison County (part) and Page County (part) | 9/23/05 | 1/3/05, 71 FR 24. | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Norfolk-Virginia Beach-Newport News (Hampton Roads), VA Area | 10/12/06, 10/16/06, 10/18/06, 11/20/06, 2/13/07 | 6/1/07, 72 FR 30490 | The SIP effective date is
6/1/07. |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Richmond-Petersburg VA Area | 9/18/06, 9/20/06, 9/25/06, 11/17/06, 2/13/07 | 6/1/07, 72 FR 30485 | The SIP effective date is 6/18/07. |
Ozone Maintenance Plan | White Top Mountain, Smyth County, VA 1-hour Ozone Nonattainment Area | 8/6/07 | 4/29/08, 73 FR 23103. | |
RACT under the 8-Hour NAAQS | Stafford County | 4/21/08 | 12/22/08, 73 FR 78192. | |
RACT under the 8-Hour NAAQS | Virginia portion of the DC-MD-VA area | 10/23/06 | 6/16/09, 74 FR 28444. | |
Reasonable Further Progress Plan (RFP), Reasonably Available Control Measures, and Contingency Measures | Washington DC-MD-VA 1997 8-hour ozone moderate nonattainment area | 6/12/07 | 9/20/11, 76 FR 58206. | |
2002 Base Year Inventory for VOC, NO | Washington DC-MD-VA 1997 8-hour ozone moderate nonattainment area | 6/12/07 | 9/20/11, 76 FR 58206. | |
2008 RFP Transportation Conformity Budgets | Washington DC-MD-VA 1997 8-hour ozone moderate nonattainment area | 6/12/07 | 9/20/11, 76 FR 58206. | |
Section 110(a)(2) Infrastructure Requirements for the 1997 Ozone NAAQS Statewide | Statewide | 7/10/08, 9/2/08, 6/8/10, 6/9/10 | 10/11/11, 76 FR 62635 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
11/13/07, 12/13/07, 8/25/11 | 2/25/14, 79 FR 10377 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(D)(i)(II). | ||
Section 110(a)(2) Infrastructure Requirements for the 1997 PM | Statewide | 7/10/08, 9/2/08, 6/8/10, 6/9/10, 4/1/08 | 10/11/11, 76 FR 62635 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
11/13/07, 7/10/08, 9/2/08, 8/25/11 | 2/25/14, 79 FR 10377 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(C), (D)(i)(II), and (J). | ||
Section 110(a)(2) Infrastructure Requirements for the 2006 PM | Statewide | 8/30/10, 4/1/11 | 10/11/11, 76 FR 62635 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
4/1/11, 8/25/11 | 2/25/14, 79 FR 10377 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(C), (D)(i)(II), and (J). | ||
Section 110(a)(2) Infrastructure Requirements for the 2008 Lead NAAQS | Statewide | 3/9/12 | 9/24/13, 78 FR 58462 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C) (for enforcement and regulation of minor sources), (D)(i)(I), (D)(i)(II) (for the visibility protection portion), (D)(ii), (E)(i), (E)(iii), (F), (G), (H), (J), (K), (L), and (M). |
3/9/12 | 2/25/14, 79 FR 10377 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(C), (D)(i)(II), and (J). | ||
12/22/14 | 4/2/15, 80 FR 17695 | Docket #2015-0040. Addresses CAA element 110(a)(2)(E)(ii). | ||
Regional Haze Plan | Statewide | 7/16/15 | 8/21/18, 83 FR 42222 | Full Approval.
See §§ 52.2452(g). |
Regional Haze Plan Supplements and BART determinations: | Statewide | 6/13/12, 77 FR 35287 | § 52.2452(d); Limited Approval. | |
1. Georgia Pacific Corporation; | 7/17/08. | |||
2a. MeadWestvaco Corporation; | 5/6/11. | |||
b. MeadWestvaco Corporation; | 3/6/09. | |||
3. O-N Minerals Facility; | 1/14/10. | |||
4. Revision to the O-N Minerals Facility permit | 11/19/10. | |||
2002 Base Year Emissions Inventory for the 1997 fine particulate matter (PM | Virginia portion of the Washington DC-MD-VA 1997 PM | 4/4/08 | 10/4/12, 77 FR 60626 | § 52.2425(f). |
Section 110(a)(2) Infrastructure Requirements for the 2010 Nitrogen Dioxide NAAQS | Statewide | 5/30/13 | 3/18/14, 79 FR 15012 | Docket #2013-0510. This action addresses the following CAA elements, or portions thereof: 110(a)(2)(A), (B), (C), (D)(i)(II), (D)(ii), (E)(i), (E)(iii), (F), (G), (H), (J), (K), (L), and (M) with the exception of PSD elements. |
5/30/13 | 9/30/14, 79 FR 58686 | Docket #2013-0510. This action addresses the following CAA elements, or portions thereof: 110(a)(2)(C), (D)(i)(II), and (J) with respect to the PSD elements. | ||
12/22/14 | 4/2/15, 80 FR 17695 | Docket #2015-0040. Addresses CAA element 110(a)(2)(E)(ii). | ||
Section 110(a)(2) Infrastructure Requirements for the 2008 Ozone NAAQS | Statewide | 7/23/12 | 3/27/14, 79 FR 17043 | Docket #2013-0211. This action addresses the following CAA elements, or portions thereof: 110(a)(2)(A), (B), (C), (D)(i)(II), (D)(ii), (E)(i), (E)(iii), (F), (G), (H), (J), (K), (L), and (M) with the exception of PSD elements. |
7/23/12 | 9/30/14, 79 FR 58686 | Docket #2013-0211. This action addresses the following CAA elements, or portions thereof: 110(a)(2)(C), (D)(i)(II), and (J) with respect to the PSD elements. | ||
12/22/14 | 4/2/15, 80 FR 17695 | Docket #2015-0040. Addresses CAA element 110(a)(2)(E)(ii). | ||
Regional Haze Five-Year Progress Report | Statewide | 11/8/13 | 5/2/14, 79 FR 25019. | |
Maintenance plan for the Virginia Portion of the Washington, DC-MD-VA Nonattainment Area for the 1997 Annual PM | Statewide | 06/03/13, 07/17/13 | 10/6/14,79 FR 60081 | See § 52.2429(b). |
Section 110(a)(2) Infrastructure Requirements for the 2010 Sulfur Dioxide NAAQS | Statewide | 6/18/14 | 3/4/15, 80 FR 11557 | Docket #2014-0522. This action addresses the following CAA elements, or portions thereof: 110(a)(2) (A), (B), (C), (D)(i)(II) (PSD), (D)(ii), (E)(i), (E)(iii), (F), (G), (H), (J) (consultation, notification, and PSD), (K), (L), and (M). |
12/22/14 | 4/2/15, 80 FR 17695 | Docket #2015-0040. Addresses CAA element 110(a)(2)(E)(ii). | ||
7/16/15 | 8/21/18, 83 FR 42222 | Docket #2017-0601. This action addresses the following CAA elements: 110(a)(2)(D)(I)(II) for visibility and 110(a)(2)(J) for visibility. | ||
8-hour Ozone Modeled Demonstration of Attainment and Attainment Plan for the 1997 Ozone National Ambient Air Quality Standards | Washington, DC-MD-VA 1997 8-Hour Ozone Nonattainment Area | 6/12/07 | 4/10/15, 80 FR 19206 | 2009 motor vehicle emissions budgets of 66.5 tons per day (tpd) for VOC and 146.1 tpd of NO |
3/18/14 | 5/26/15, 80 FR 29963 | Removal of Stage II vapor recovery program. See section 52.2428. | ||
2011 Base Year Emissions Inventory for the 2008 8-hour ozone standard | Virginia portion of the Washington, DC-MD-VA 2008 ozone nonattainment area | 7/17/14 | 5/13/15, 80 FR 27258 | § 52.2425(g). |
Section 110(a)(2) Infrastructure Requirements for the 2012 Particulate Matter NAAQS | Statewide | 7/16/15 | 6/16/16, 81 FR 39210 | Docket #2015-0838. This action addresses the following CAA elements, or portions thereof: 110(a)(2)(A), (B), (C), (D)(i)(II) (PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
7/16/15 | 8/21/18, 83 FR 42222 | Docket #2017-0601. This action addresses the following CAA element: 110(a)(2)(D)(I)(II) for visibility. | ||
Emissions Statement Rule Certification for the 2008 Ozone NAAQS | Virginia portion of the Washington, DC-MD-VA nonattainment area for the 2008 ozone NAAQS ( | 8/01/17 | 6/01/18, 83 FR 25381 | Certification that Virginia's previously SIP-approved regulations at 9VAC5-20-160 meet the emissions statement requirements of CAA section 182(a)(3)(B) for the 2008 ozone NAAQS. |
2008 8-Hour Ozone NAAQS Nonattainment New Source Review Requirements | Virginia portion of the Washington, DC-MD-VA nonattainment area for the 2008 ozone NAAQS ( | 5/17/17 | 9/7/17, 83 FR 45356 | |
Maintenance plan for the Virginia portion of the Washington, DC-MD-VA Nonattainment Area for the 2008 8-hour ozone National Ambient Air Quality Standard | Arlington, Fairfax, Loudoun, and Prince William Counties and the Cities of Alexandria, Fairfax, Falls Church, Manassas, and Manassas Park | 1/3/18 | 4/15/2019, 84 FR 15117 | § 52.2428(m). |
Section 110(a)(2) Infrastructure Requirements for the 2015 Ozone NAAQS | Statewide | 1/28/2019 | 3/17/2020, 85 FR 15076 | This action addresses the following CAA elements: CAA section 110(a)(2)(A), (B), (C), (D)(i)(II), D(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
Emissions Statement Certification for the 2015 Ozone National Ambient Air Quality Standard | Virginia portion of the Washington, DC-MD-VA nonattainment area for the 2015 ozone NAAQS ( | 7/30/19 | 5/15/20, 85 FR 29327 | Certification that Virginia's previously SIP-approved regulations at 9VAC5-20-160 meet the emissions statement requirements of CAA section 182(a)(3)(B) for the 2015 ozone NAAQS. |
CTG Negative Declarations Certification for the 2008 Ozone National Ambient Air Quality Standard | Northern Virginia VOC emissions control area | 04/02/20 | 2/10/21, 86 FR 8872 | Certifies negative declarations for CTG and ACT source categories in Northern Virginia, including the 2016 Oil and Gas CTG. |
Revision to the Classification and Implementation of the 2015 Ozone National Ambient Air Quality Standard for the Northern Virginia Nonattainment Area | Northern Virginia Ozone Nonattainment Area | 8/28/20 | 3/3/22, 87 FR 19960 | This revision consists of an amendment to an existing regulation which adds a new section listing the localities that comprise the Northern Virginia ozone nonattainment area. |
2017 Base Year Emissions Inventories for the Washington, DC-MD-VA Nonattainment Area for the 2015 Ozone National Ambient Air Quality Standard | The Virginia portion of the Washington, DC-MD-VA nonattainment area for the 2015 ozone NAAQS ( | 12/11/2020 | 4/13/2022, 87 FR 21755 | The Virginia portion consists of Arlington, Fairfax, Loudoun, and Prince William counties and Alexandria, Fairfax, Falls Church, Manassas, and Manassas Park cities. |
CTG Negative Declaration Certification for the 2015 Ozone National Ambient Air Quality Standard for the 2016 Oil and Gas CTG | Northern Virginia VOC emissions control area | 8/9/21 | 9/12/22, 87 FR 55699 | Certifies negative declaration for the 2016 Oil and Gas CTG. |
Second Maintenance Plan for the Richmond-Petersburg 1997 8-Hour Ozone Nonattainment Area | Richmond-Petersburg Area | 09/21/21 | 3/23/23, 88 FR 17376 | The Richmond-Petersburg area consists of the counties of Charles City, Chesterfield, Hanover, Henrico, and Prince George, and the cities of Colonial Heights, Hopewell, Richmond, and Petersburg. |
1997 8-Hour Ozone National Ambient Air Quality Standard Second Maintenance Plan for the Hampton Roads Area | Hampton Roads Area (Norfolk-Virginia Beach-Newport News area) | 09/09/2022 | 10/17/2023, 88 FR 71489 | The Hampton Roads Area consists of the counties of Gloucester, Isle of Wight, James City, and York, and the cities of Chesapeake, Hampton, Newport News, Norfolk, Poquoson, Portsmouth, Suffolk, Virginia Beach, and Williamsburg. |
Second Maintenance Plan for the Fredericksburg 1997 8-Hour Ozone Nonattainment Area | Fredericksburg Area | 5/25/23 | 4/12/24, 89 FR 25812 | The Fredericksburg Area consists of the city of Fredericksburg, and the counties of Spotsylvania and Stafford. |
(2) Documents incorporated by reference in regulation 9VAC5-20-21.
Revised paragraph in
regulation 5-20-21 | Applicable geographic area | State submittal date | EPA approval date | Additional explanation |
---|---|---|---|---|
9VAC5-60-100 (adopts 40 CFR 63.460 through 63.469 by reference) | Statewide | 10/9/98 | 11/3/99, 64 FR 59648 | 52.2423(q). |
9VAC5-20-21, paragraphs E.1 through E.5 and E.7 | Statewide | 4/12/89 | 8/23/95, 60 FR 43714 | 52.2423(m); Originally Appendix M, Sections II.A. through II.E. and II.G. |
9VAC5-20-21, paragraphs E.1 and E.2 | Statewide | 2/12/93 | 8/23/95, 60 FR 43714 | 52.2423(n); Originally Appendix M, Sections II.A. and II.B. |
9VAC5-20-21, Section E | Statewide | 6/22/99 | 1/7/03, 68 FR 663 | 52.2423(r). |
9VAC5-20-21, paragraph E.12 | Statewide | 2/23/04 | 6/8/04, 69 FR 31893 | 52.2423(s). |
9VAC5-20-21, Section E | Northern Virginia VOC Emissions Control Area designated in 9VAC5-20-206 | 3/24/04 | 5/12/05, 70 FR 24970 | 9VAC5-20-21, Sections E.1.a.(7)., E.4.a.(12) through a.(17), E.10., E.11., E.13.a.(1), and E.13.a.(2). |
9VAC5-20-21, Sections D and E | Statewide | 8/25/05 | 3/3/06, 71 FR 10838 | Sections D., E. (introductory sentence), E.2 (all paragraphs), E.3.b, E.4.a.(1) and (2), E.4.b. , E.5. (all paragraphs), and E.7. (all paragraphs) State effective date is 2/1/00. |
9VAC5-20-21, Section B | Statewide | 10/25/05 | 3/3/06, 71 FR 10838 | State effective date is 3/9/05; approval is for those provisions of the CFR which implement control programs for air pollutants related to the national ambient air quality standards (NAAQS) and regional haze. |
9VAC5-20-21, Section E | Northern Virginia VOC Emissions Control Area designated in 9VAC5-20-206 | 10/25/05 | 1/30/07, 72FR 4207 | 9VAC5-20-21, Sections .1.a.(16)., E.4.a.(18) through a.(20), E.6.a, E.11.a.(3), E.12.a.(5) through a.(8), E.14.a. and E.14.b.
State effective date is 3/9/05. |
9VAC5-20-21, Paragraphs E.4.a. (21) and (22) | Fredericksburg VOC Emissions Control Area Designated in 9VAC5-20-206 | 5/14/07 | 12/5/07, 72 FR 68511 | State effective date is 10/4/06. |
9VAC5-20-21, Sections B. and E.1 | Statewide | 6/24/09 | 1/18/11, 76 FR 2829 | Revised sections. |
9VAC5-20-21, Sections E.1.a.(1)(q) and E.1.a.(1)(r) | Statewide | 9/27/10 | 4/25/11, 76 FR 22814 | Revised sections. |
9VAC5-20-21, Section E.1.a.(1)(s) | Statewide | 8/18/10 | 6/22/11, 76 FR 36326 | Added Section. |
9VAC5-20-21, Sections E.1.a.(2), (16)-(19), E.2.a.(3), E.2.b., E.4.a.(23)-(27), E.11.a.(4)-(6), E.12.a.(3), (5) and (9)-(11) | Northern Virginia and Fredericksburg VOC Emissions Control Areas | 3/17/10 | 1/26/12, 77 FR 3928 | Added section. |
9VAC5-20-21 Section E.1.a(1) Documents Incorporated by Reference | Statewide | 5/25/11 | 2/3/12, 77 FR 5400 | Addition of paragraph (1)(a) and (1) (u). The citations of all other paragraphs are revised. |
Documents incorporated by reference | Northern Virginia VOC emissions control area | 2/01/16 | 10/21/16, 81 FR 72711 | Section 15 added. |
§ 52.2421 - Classification of regions.
The Virginia plan was evaluated on the basis of the following classifications:
Air quality control region | Pollutant | ||||
---|---|---|---|---|---|
Particulate matter | Sulfur oxides | Nitrogen dioxide | Carbon monoxide | Photochemical oxidants (hydrocarbons) | |
Eastern Tennessee-Southwestern Virginia Interstate | I | I | III | III | III |
Valley of Virginia Intrastate | I | III | III | III | III |
Central Virginia Intrastate | I | III | III | III | III |
Northeastern Virginia Intrastate | IA | III | III | III | III |
State Capital Intrastate | I | III | III | III | I |
Hampton Roads Intrastate | I | II | III | III | I |
National Capital Interstate | I | I | III | I | I |
§ 52.2423 - Approval status.
(a) With the exceptions set forth in this subpart, the Administrator approves Virginia's plan for the attainment and maintenance of the national standards.
(b)-(e) [Reserved]
(f) Section 9VAC 5-40-20.A.4. of the Virginia Regulations for the Control and Abatement of Air Pollution is not considered part of the applicable plan because it contradicts a previously approved section of the SIP.
(g) [Reserved]
(h) In an April 19, 1991 request submitted by the Virginia Department of Air Pollution Control, the source-specific emission limitation for James River Paper which EPA had approved on August 18, 1983 is deleted. James River Paper Co. (now known as Custom Papers Group—Richmond, Inc.) located in Richmond, Virginia is now required to comply with the applicable Virginia SIP paper coating regulation.
(i) Pursuant to an October 31, 1991 request submitted by the Virginia Department of Air Pollution Control, the source-specific Alternate Control Program (bubble) for J.W. Fergusson & Sons, Inc. which EPA had approved on March 4, 1983, is removed from the plan. J.W. Fergusson & Sons, Inc. located in Richmond, Virginia is required to comply with the Virginia SIP graphic arts RACT regulation approved by EPA on January 25, 1984 (see 40 CFR 52.2420(c)(48) and (c)(74)).
(j)-(l) [Reserved]
(m) EPA approves as part of the Virginia State Implementation Plan the documents listed in Appendix M, Sections II.A. through II.E and Section II.G. (currently Regulation 5-20-21 E.1. through E.5 and E.7) of the Virginia Regulations for the Control and Abatement of Air Pollution submitted by the Virginia Department of Air Pollution Control on April 12, 1989.
(n) EPA approves as part of the Virginia State Implementation Plan the revised references to the documents listed in Appendix M, Sections II.A. and II.B. (currently Regulation 5-20-21E.1 and E.2) of the Virginia Regulations for the Control and Abatement of Air Pollution submitted by the Virginia Department of Air Pollution Control on February 12, 1993.
(o) EPA approves the revised confidentiality of information provisions of Sections 120-02-30, submitted by the Virginia Department of Air Pollution Control on March 18, 1993, as revisions to the Virginia SIP. However, should Virginia submit a SIP revision request on behalf of a source, which contains information that has been judged confidential under the provisions of Section 120-02-30, Virginia must request EPA to consider confidentiality according to the provisions of 40 CFR part 2. EPA is obligated to keep such information confidential only if the criteria of 40 CFR part 2 are met.
(p) EPA disapproves the revised public participation provisions of Sections 120-08-01G.1 and 120-08-01G.4.b, submitted by the Virginia Department of Air Pollution Control on March 29, 1993, as revisions to the Virginia SIP. These revised provisions do not meet the requirements of 40 CFR 51.160 and 51.161. In its place, EPA retains the SIP provisions of Section 120-08-01C.1.a and 01C.4.b through d. as originally approved at §§ 52.2420(c)(69) [SIP section 2.33(a)(5)(ii)] and subsequently revised, due to format changes, at §§ 52.2420(c)(89)(i)(B)(7) [SIP section 120-08-01C.4.b].
(q) EPA approves as part of the Virginia State Implementation Plan the following revisions to the Virginia Regulations for the Control and Abatement of Pollution submitted by the Virginia Department of Environmental Quality on October 9, 1998:
(1) Subpart T of 9 VAC 5-60-100 Designated emission standards of Rule 6-2 (9 VAC 5-60-90 et seq.) of 9 VAC 5 Chapter 60 amended to adopt 40 CFR 63.460 through 63.469 by reference. This amendment was adopted on January 8, 1997, published in the Virginia Register of Regulations on March 31, 1997 and effective on May 1, 1997.
(2) Revised date reference to 40 CFR part 63 (July 1, 1996) contained in 9 VAC 5-60-90 (General), as it pertains to the documents listed in 9 VAC 5-60-100, Subpart T.
(r) EPA approves as part of the Virginia State Implementation Plan the revised references to the documents listed in Chapter 20, Section 9 VAC 5-20-21 (formerly Appendix M), Sections E.4.a.(1), E.4.a.(2), and E.7.a.(1) through E.7.a.(3), of the Virginia Regulations for the Control and Abatement of Air Pollution submitted by the Virginia Department of Environmental Quality on June 22, 1999.
(s) EPA approves as part of the Virginia State Implementation Plan the references to the documents listed in 9 VAC 5 Chapter 20, Section 5-20-21, paragraph E.12 of the Virginia Regulations for the Control and Abatement of Air Pollution submitted by the Virginia Department of Environmental Quality on February 23, 2004.
§ 52.2424 - Motor vehicle emissions budgets.
(a) Motor vehicle emissions budget for the Hampton Roads maintenance area adjusting the mobile emissions budget contained in the maintenance plan for the horizon years 2015 and beyond adopted on August 29, 1996 and submitted by the Virginia Department of Environmental Quality on August 29, 1996.
(b) Motor vehicle emissions budget for the Richmond maintenance area adjusting the mobile emissions budget contained in the maintenance plan for the horizon years 2015 and beyond adopted on July 30, 1996 and submitted by the Virginia Department of Environmental Quality on July 30, 1996.
(c) EPA approves the following revised 2009 and 2015 motor vehicle emissions budgets (MVEBs) for the Fredericksburg 8-Hour Ozone Maintenance Area submitted by the Virginia Department of Environmental Quality (VADEQ) on September 26, 2011:
Applicable geographic area | Year | Tons per day (TPD) NO |
---|---|---|
Fredericksburg Area (Spotsylvania and Stafford Counties and City of Fredericksburg) | 2009 | 19.615 |
Fredericksburg Area (Spotsylvania and Stafford Counties and City of Fredericksburg) | 2015 | 12.933 |
§ 52.2425 - Base Year Emissions Inventory.
(a) EPA approves as a revision to the Virginia Implementation Plan the 1990 base year emission inventory for the Washington Metropolitan Statistical Area, submitted by Director, Virginia Department of Environmental Quality, on November 1, 1993, April 3, 1995 and October 12, 1995. This submittal consists of the 1990 base year stationary, area and off-road mobile and on-road mobile emission inventories in the Washington Statistical Area for the pollutant, carbon monoxide (CO).
(b) EPA approves as a revision to the Virginia State Implementation Plan the 1990 base year emission inventories for the Richmond-Petersburg, Norfolk-Virginia Beach, and Smyth County ozone nonattainment areas submitted by the Director, Virginia Department of Environmental Quality on November 11, 1992, November 18, 1992, November 1, 1993, and December 15, 1994. These submittals consist of the 1990 base year point, area, non-road mobile, biogenic and on-road mobile source emission inventories in each area for the following pollutants: volatile organic compounds (VOC), carbon monoxide (CO), and oxides of nitrogen (NO
(c) EPA approves as a revision to the Virginia State Implementation Plan the 1990 base year emission inventories for the Northern Virginia ozone nonattainment areas submitted by the Director, Virginia Department Environmental Quality, on November 30, 1992, November 1, 1993, and April 3, 1995. These submittals consist of the 1990 base year point, area, non-road mobile, biogenic and on-road mobile source emission inventories in each area for the following pollutants: volatile organic compounds (VOC), carbon monoxide (CO), and oxides of nitrogen (NO
(d) EPA approves as a revision to the Virginia State Implementation Plan amendments to the 1990 base year emission inventories for the Northern Virginia ozone nonattainment area submitted by the Director, Virginia Department Environmental Quality, on December 17, 1997. This submittal consists of amendments to the 1990 base year point, area, non-road mobile, and on-road mobile source emission inventories for the following pollutants: volatile organic compounds (VOC), and oxides of nitrogen (NO
(e) EPA approves as a revision to the Virginia State Implementation Plan the 2002 base year emissions inventories for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007. This submittal consists of the 2002 base year point, area, non-road mobile, and on-road mobile source inventories in area for the following pollutants: volatile organic compounds (VOC), carbon monoxide (CO) and nitrogen oxides (NO
(f) EPA approves as a revision to the Virginia State Implementation Plan the 2002 base year emissions inventory for the Virginia portion of the Washington DC-MD-VA 1997 fine particulate matter (PM
(g) EPA approves as a revision to the Virginia State Implementation Plan the 2011 base year emissions inventory for the Virginia portion of the Washington, DC-MD-VA 2008 8-hour ozone nonattainment area submitted by the Virginia Department of Environmental Quality on July 17, 2014. The 2011 base year emissions inventory includes emissions estimates that cover the general source categories of point sources, non-road mobile sources, area sources, on-road mobile sources, and biogenic sources. The pollutants that comprise the inventory are carbon monoxide (CO), nitrogen oxides (NO
§ 52.2426 - Photochemical Assessment Monitoring Stations (PAMS) Program.
On November 23, 1994 Virginia's Department of Environmental Quality submitted a plan for the establishment and implementation of a Photochemical Assessment Monitoring Stations (PAMS) Program as a state implementation plan (SIP) revision, as required by section 182(c)(1) of the Clean Air Act. EPA approved the Photochemical Assessment Monitoring Stations (PAMS) Program on September 11, 1995 and made it part of the Virginia SIP. As with all components of the SIP, Virginia must implement the program as submitted and approved by EPA.
§ 52.2428 - Control Strategy: Carbon monoxide and ozone.
(a) Determination—EPA has determined that, as of November 5, 1997, the Richmond ozone nonattainment area, which consists of the counties of Chesterfield, Hanover, Henrico, and part of Charles City County, and of the cities of Richmonds, Colonial Heights and Hopewell, has attained the 1-hour .12 ppm ozone standard based on three years of air quality data for 1993, 1994 and 1995. EPA has further determined that the reasonable further progress and attainment demonstration requirements of section 182(b)(1) and related requirements of section 172(c)(9) of the Clean Air Act do not apply to the Richmond area for so long as the area does not monitor any violations of the 1-hour .12ppm ozone standard, or until the area is no longer designated nonattainment. If a violation of the ozone NAAQS is monitored in the Richmond ozone nonattainment area while the area is designated nonattainment, these determinations shall no longer apply.
(b) EPA approves the Commonwealth's 15 Percent Rate of Progress Plan for the Virginia portion of the Metropolitan Washington, D.C. ozone nonattainment area, submitted by the Acting Director of the Virginia Department of the Environmental Quality on April 14, 1998.
(c)-(d) [Reserved]
(e) Based upon EPA's review of the air quality data for the 3-year period 2003 to 2005, EPA has determined that the Washington, DC severe 1-hour ozone nonattainment area attained the 1-hour ozone NAAQS by the applicable attainment date of November 15, 2005. EPA also has determined that the Washington, DC severe 1-hour ozone nonattainment area is not subject to the imposition of the section 185 penalty fees.
(f) EPA approves revisions to the Virginia State Implementation Plan consisting of the 2008 reasonable further progress (RFP) plan, reasonably available control measures, and contingency measures for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007.
(g) EPA approves the following 2008 RFP motor vehicle emissions budgets (MVEBs) for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007:
Transportation Conformity Emissions Budgets for the Washington, DC-MD-VA Area
Type of control strategy
SIP | Year | VOC
(TPD) | NO (TPD) | Effective date
of adequacy determination or SIP approval |
---|---|---|---|---|
Rate of Progress Plan | 2008 | 70.8 | 159.8 | September 21, 2009 (74 FR 45853), published September 4, 2009. |
(h) Determination of attainment. EPA has determined, as of February 28, 2012, that based on 2007 to 2009 and 2008 to 2010 ambient air quality data, the Washington, DC-MD-VA moderate nonattainment area has attained the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS). This determination, in accordance with 40 CFR 51.918, suspends the requirements for this area to submit an attainment demonstration, associated reasonably available control measures, a reasonable further progress plan, contingency measures, and other planning SIPs related to attainment of the standard for as long as this area continues to meet the 1997 8-hour ozone NAAQS.
(i) As of October 10, 2014, EPA approves the removal of the Stage II vapor recovery program from the maintenance plans for the Richmond 1990 1-Hour Ozone Maintenance Area and the Richmond-Petersburg 1997 8-Hour Ozone Maintenance Area.
(j) EPA approves revisions to the Virginia State Implementation Plan consisting of the attainment demonstration required under 40 CFR 51.908 demonstrating attainment of the 1997 ozone NAAQS by the applicable attainment date of June 15, 2010 and the failure to attain contingency measures for the Washington, DC-MD-VA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007.
(k) EPA approves the following 2009 attainment demonstration and 2010 motor vehicle emissions budgets (MVEBs) for the Washington, DC-MDVA 1997 8-hour ozone moderate nonattainment area submitted by the Director of the Virginia Department of Environment Quality on June 12, 2007:
Transportation Conformity Emissions Budgets for the Washington, DC-MD-VA Area
Type of control strategy SIP | Year | VOC (TPD) | NO | Effective date of adequacy determination or SIP approval |
---|---|---|---|---|
Attainment Demonstration | 2009 | 66.5 | 146.1 | February 22, 2013 (78 FR 9044), published February 7, 2013. |
Contingency Measures Plan | 2010 | 144.3 | February 22, 2013 (78 FR 9044), published February 7, 2013. |
(l) As of May 26, 2015, EPA approves the removal of the Stage II vapor recovery program from the attainment plans for the Virginia portion of the Washington DC-MD-VA 1990 1-hour and 1997 8-hour Ozone NAAQS Nonattainment Areas and from the maintenance plan for the Fredericksburg 1997 8-Hour Ozone Maintenance Area.
(m) EPA approves the maintenance plan for the Virginia portion of the Washington, DC-MD-VA nonattainment area for the 2008 8-hour ozone NAAQS submitted by the Director of the Virginia Department of Environmental Quality on January 3, 2018. The maintenance plan includes 2014, 2025, and 2030 motor vehicle emission budgets (MVEBs) for VOC and NO
Table 3 to Paragraph
Type of control strategy SIP | Year | VOC
(TPD) | NO (TPD) | Effective date of adequacy determination of SIP approval |
---|---|---|---|---|
Maintenance Plan | 2014
2025 2030 | 61.3
33.2 24.1 | 136.8
40.7 27.4 | 5/15/2019. |
Table 4 to Paragraph
Type of control strategy SIP | Year | VOC
(TPD) | NO (TPD) | Effective date of adequacy determination of SIP approval |
---|---|---|---|---|
Maintenance Plan | 2014
2025 2030 | 61.3
39.8 28.9 | 136.8
48.8 32.9 | Contingent and effective upon interagency consultation. |
§ 52.2429 - Control strategy: Particulate matter.
(a) Determination of Attainment. EPA has determined, as of January 12, 2009, the Virginia portion of the Metropolitan Washington, DC-MD-VA nonattainment area for the 1997 PM
(b) Maintenance Plan and Transportation Conformity Budgets. EPA approves the maintenance plan for the Virginia portion of the Washington, DC-MD-VA nonattainment area for the 1997 annual PM
Washington, DC-MD-VA PM
Type of control strategy SIP | Year | NO | PM | Effective date of SIP approval |
---|---|---|---|---|
Maintenance Plan | 2017 | 41,709 | 1,787 | 11/5/14 |
2025 | 27,400 | 1,350 |
Washington, DC-MD-VA PM
Type of control strategy SIP | Year | NO | PM | Effective date of SIP approval |
---|---|---|---|---|
Maintenance Plan | 2017 | 50,051 | 2,144 | Contingent and effective upon interagency consultation. |
2025 | 32,880 | 1,586 |
§ 52.2430 - Determinations of attainment.
(a) Based upon EPA's review of the air quality data for the 3-year period 2007 to 2009, EPA determined that the Metropolitan Washington, District of Columbia-Maryland-Virginia (DC-MD-VA) fine particle (PM
(b) Based upon EPA's review of the air quality data for the 3-year period 2007 to 2009, Washington, DC-MD-VA moderate nonattainment area has attained the 1997 8-hour ozone NAAQS by the applicable attainment date of June 15, 2010. Therefore, EPA has met the requirement pursuant to CAA section 181(b)(2)(A) to determine, based on the area's air quality as of the attainment date, whether the area attained the standard. EPA also determined that the Washington, DC-MD-VA moderate nonattainment area will not be reclassified for failure to attain by its applicable attainment date pursuant to section 181(b)(2)(A).
(c) Based upon EPA's review of the air quality data for the 3-year period 2013 to 2015, the Washington, DC-MD-VA marginal ozone nonattainment area has attained the 2008 8-hour ozone national ambient air quality standard (NAAQS) by the applicable attainment date of July 20, 2016. Therefore, EPA has met the requirement pursuant to Clean Air Act section 181(b)(2)(A) to determine, based on the area's air quality as of the attainment date, whether the area attained the standard. EPA also determined that the Washington, DC-MD-VA marginal nonattainment area will not be reclassified for failure to attain by its applicable attainment date pursuant to section 181(b)(2)(A).
§ 52.2440 - Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?
(a)(1) The owner and operator of each source and each unit located in the State of Virginia and for which requirements are set forth under the CSAPR NO
(2) Notwithstanding the provisions of paragraph (a)(1) of this section, if, at the time of the approval of Virginia's SIP revision described in paragraph (a)(1) of this section, the Administrator has already started recording any allocations of CSAPR NO
(b)(1) The owner and operator of each source and each unit located in the State of Virginia and for which requirements are set forth under the CSAPR NO
(2) The owner and operator of each source and each unit located in the State of Virginia and for which requirements are set forth under the CSAPR NO
(3) The owner and operator of each source and each unit located in the State of Virginia and for which requirements are set forth under the CSAPR NO
(4) Notwithstanding the provisions of paragraph (b)(3) of this section, if, at the time of the approval of Virginia's SIP revision described in paragraph (b)(3) of this section, the Administrator has already started recording any allocations of CSAPR NO
(5) Notwithstanding the provisions of paragraph (b)(2) of this section, after 2020 the provisions of § 97.826(c) of this chapter (concerning the transfer of CSAPR NO
(c) The owner and operator of each source located in the State of Virginia and for which requirements are set forth in § 52.40 and § 52.41, § 52.42, § 52.43, § 52.44, § 52.45, or § 52.46 must comply with such requirements with regard to emissions occurring in 2026 and each subsequent year.
§ 52.2441 - Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of sulfur dioxide?
(a) The owner and operator of each source and each unit located in the State of Virginia and for which requirements are set forth under the CSAPR SO
(b) Notwithstanding the provisions of paragraph (a) of this section, if, at the time of the approval of Virginia's SIP revision described in paragraph (a) of this section, the Administrator has already started recording any allocations of CSAPR SO
§ 52.2451 - Significant deterioration of air quality.
(a) The requirements of sections 160 through 165 of the Clean Air Act are met since the plan includes approvable procedures for the Prevention of Significant Air Quality Deterioration.
(b) Regulations for preventing significant deterioration of air quality. The provisions of § 52.21 (b) through (w) are hereby removed from the applicable state plan for the Commonwealth of Virginia.
§ 52.2452 - Visibility protection.
(a) Reasonably Attributable Visibility Impairment. The requirements of section 169A of the Clean Air Act are not met because the plan does not include approvable measures for meeting the requirements of 40 CFR 51.305 for protection of visibility in mandatory Class I Federal areas.
(b)-(f) [Reserved]
(g) EPA converts its limited approval/limited disapproval of Virginia's regional haze program to a full approval. This SIP revision changes Virginia's reliance from the Clean Air Interstate Rule to the Cross-State Air Pollution Rule to meet the regional haze SIP best available retrofit technology requirements for certain sources and to meet reasonable progress requirements.
§ 52.2454 - Prevention of significant deterioration of air quality for Merck & Co., Inc.'s Stonewall Plant in Elkton, VA.
(a) Applicability. (1) This section applies only to the pharmaceutical manufacturing facility, commonly referred to as the Stonewall Plant, located at Route 340 South, in Elkton, Virginia (“site”).
(2) This section sets forth the prevention of significant deterioration of air quality preconstruction review requirements for the following pollutants only: carbon monoxide, nitrogen oxides, ozone (using volatile organic compounds as surrogate), particulate matter with an aerodynamic diameter less than 10 microns (PM
(b) Definitions. For the purposes of this section:
12-month rolling total for an individual pollutant or the total criteria pollutants, as specified in paragraph (d) of this section, is calculated on a monthly basis as the sum of all actual emissions of the respective pollutant(s) from the previous 12 months.
Act means the Clean Air Act, as amended, 42 U.S.C. 7401, et seq.
Completion of the powerhouse conversion means the date upon which the new boilers, installed pursuant to paragraph (g) of this section, are operational. This determination shall be made by the site based on the boiler manufacturer's installation, startup and shakedown specifications.
Permitting authority means either of the following:
(1) The Administrator, in the case of an EPA-implemented program; or
(2) The State air pollution control agency, or other agency delegated by the Administrator, pursuant to paragraph (o) of this section, to carry out this permit program.
Process unit means:
(1) Manufacturing equipment assembled to produce a single intermediate or final product; and
(2) Any combustion device.
Responsible official means:
(1) The president, secretary, treasurer, or vice-president of the business entity in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the business entity; or
(2) A duly authorized representative of such business entity if the representative is responsible for the overall operation of one or more manufacturing, production, or operating facilities applying for or subject to a permit and either:
(i) The facilities employ more than 250 persons or have gross annual sales or expenditures exceeding $25 million (in second quarter 1980 dollars); or
(ii) The authority to sign documents has been assigned or delegated to such representative in accordance with procedures of the business entity.
Site means the contiguous property at Route 340 South, Elkton, Virginia, under common control by Merck & Co., Inc., and its successors in ownership, known as the Stonewall site.
(c) Authority to issue permit. The permitting authority may issue to the site a permit which complies with the requirements of paragraphs (d) through (n) of this section. The Administrator may delegate, in whole or in part, pursuant to paragraph (o) of this section, the authority to administer the requirements of this section to a State air pollution control agency, or other agency authorized by the Administrator.
(d) Site-wide emissions caps. The permit shall establish site-wide emissions caps as provided in this paragraph.
(1) Initial site-wide emissions caps. The initial site-wide emissions caps shall be based on the site's actual emissions during a time period, within five years of the date of permit issuance, which represents normal site operation. The permitting authority may allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual site-wide emissions shall be calculated using the actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.
(i) Total criteria pollutant emissions cap. The permit shall establish a total criteria pollutant emissions cap (total emissions cap). The criteria pollutants included in the total emissions cap are the following: carbon monoxide, nitrogen oxides, ozone (using volatile organic compounds as surrogate), particulate matter with an aerodynamic diameter less than 10 microns, and sulfur dioxide.
(ii) Individual pollutant caps. The permit shall establish individual pollutant caps for sulfur dioxide, nitrogen oxides and PM
(2) Adjustments to the site-wide emissions caps. (i) The permit shall require that upon completion of the powerhouse conversion, the site shall reduce the site-wide emissions caps as follows:
(A) The total emissions cap shall be reduced by 20 percent from the initial site-wide emissions cap established pursuant to paragraph (d)(1)(i) of this section.
(B) The sulfur dioxide cap shall be reduced by 25 percent from the initial site-wide emissions cap established pursuant to paragraph (d)(1)(ii) of this section.
(C) The nitrogen oxide cap shall be reduced by 10 percent from the initial site-wide emissions cap established pursuant to paragraph (d)(1)(ii) of this section.
(ii) The permit may specify other reasons for adjustment of the site-wide emissions caps.
(e) Operating under the site-wide emissions caps. (1) The permit shall require that the site's actual emissions of criteria pollutants shall not exceed the total emissions cap established pursuant to paragraph (d) of this section.
(2) The permit shall require that the site's actual emissions of sulfur dioxide, nitrogen oxides and PM
(3) Compliance with the total emissions cap and individual pollutant caps shall be determined by comparing the respective cap to the 12-month rolling total for that cap. Compliance with the total emissions cap and individual pollutant caps shall be determined within one month of the end of each month based on the prior 12 months. The permit shall set forth the emission calculation techniques which the site shall use to calculate site-wide actual criteria pollutant emissions.
(4) Installation of controls for significant modifications and significant new installations. (i) This paragraph applies to significant modifications and significant new installations. Significant modifications for the purposes of this section are defined as changes to an existing process unit that result in an increase of the potential emissions of the process unit, after consideration of existing controls, of more than the significance levels listed in paragraph (e)(4)(ii) of this section. Significant new installations for the purposes of this section are defined as new process units with potential emissions before controls that exceed the significance levels listed in paragraph (e)(4)(ii) of this section. For purposes of this section, potential emissions means process unit point source emissions that would be generated by the process unit operating at its maximum capacity.
(ii) The significance levels for determining significant modifications and significant new installations are: 100 tons per year of carbon monoxide; 40 tons per year of nitrogen oxides; 40 tons per year of sulfur dioxide; 40 tons per year of volatile organic compounds; and 15 tons per year of PM
(iii) For any significant modification or significant new installation, the permit shall require that the site install, at the process unit, emission controls, pollution prevention or other technology that represents good environmental engineering practice in the pharmaceutical or batch processing industry, based on the emission characteristics (such as flow, variability, pollutant properties) of the process unit.
(f) Operation of control equipment. The permit shall require that the site shall continue to operate the emissions control equipment that was previously subject to permit requirements at the time of issuance of a permit pursuant to this section. This equipment shall be operated in a manner which minimizes emissions, considering the technical and physical operational aspects of the equipment and associated processes. This operation shall include an operation and maintenance program based on manufacturers' specifications and good engineering practice.
(g) Powerhouse conversion. The permit shall require that the site convert the steam-generating powerhouse from burning coal as the primary fuel to burning natural gas as the primary fuel and either No. 2 fuel oil or propane as backup fuel.
(1) The new boilers shall be equipped with low nitrogen oxides technology.
(2) The site shall complete the powerhouse conversion (completion of the powerhouse conversion) no later than 30 months after the effective date of the permit.
(h) Monitoring, recordkeeping and reporting. (1) The permit shall set forth monitoring, recordkeeping, and reporting requirements sufficient to demonstrate compliance with the site-wide emissions caps. The monitoring, recordkeeping and reporting requirements shall be structured in a tiered system, such that the requirements become more stringent as the site's emissions approach the total emissions cap.
(2) At a minimum, the permit shall require that the site submit to the permitting authority semi-annual reports of the site-wide criteria pollutant emissions (expressed as a 12-month rolling total) for each month covered by the report. These reports shall include a calculation of the total emissions cap, as well as, the emissions of sulfur dioxide, nitrogen oxides, carbon monoxide, volatile organic compounds and PM
(3) Any reports required by the permit to be submitted on an annual or semi-annual basis shall contain a certification by the site's responsible official that to his belief, based on reasonable inquiry, the information submitted in the report is true, accurate, and complete.
(4) Any records required by the permit shall be retained on site for at least five years.
(i) Air quality analysis. The permittee shall demonstrate, prior to permit issuance and on a periodic basis which shall be specified in the permit, that emissions from construction or operation of the site will not cause or contribute to air pollution in excess of any:
(1) Maximum allowable increase or maximum allowable concentration for any pollutant, pursuant to section 165 of the Act;
(2) National ambient air quality standard or;
(3) Other applicable emission standard or standard of performance under the Act.
(j) Termination. (1) The permit may be terminated as provided in this paragraph for reasons which shall include the following, as well as any other termination provisions specified in the permit:
(i) If the Administrator or the permitting authority determines that continuation of the permit is an imminent and substantial endangerment to public health or welfare, or the environment;
(ii) If the permittee knowingly falsifies emissions data;
(iii) If the permittee fails to implement the powerhouse conversion pursuant to paragraph (g) of this section;
(iv) If the permittee receives four consent orders or two judgments adverse to the site arising from non-compliance with this permit in a five year period that are deemed material by the Administrator or the permitting authority; or
(v) If the total emissions cap is exceeded.
(2) In the event of termination, the Administrator or the permitting authority shall provide the permittee with written notice of its intent to terminate the permit. Within 30 calendar days of the site's receipt of this notice, the site may take corrective action to remedy the cause of the termination. If this remedy, which may include a corrective action plan and schedule, is deemed acceptable by the Administrator or the permitting authority (whichever agency provided written notice of its intent to terminate the permit), the action to terminate the permit shall be withdrawn. Otherwise, the permit shall be terminated in accordance with procedures specified in the permit.
(3) Termination of the permit does not waive the site's obligation to complete any corrective actions relating to non-compliance under the permit.
(k) Inspection and entry. (1) Upon presentation of credentials and other documents as may be required by law, the site shall allow authorized representatives of the Administrator and the permitting authority to perform the following:
(i) Enter upon the site;
(ii) Have access to and copy, at reasonable times, any records that must be kept under the conditions of the permit;
(iii) Have access at reasonable times to batch and other plant records needed to verify emissions.
(iv) Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations required under the permit;
(v) Sample or monitor any substances or parameters at any location, during operating hours, for the purpose of assuring permit compliance or as otherwise authorized by the Act.
(2) No person shall obstruct, hamper, or interfere with any such authorized representative while in the process of carrying out his official duties. Refusal of entry or access may constitute grounds for permit violation and assessment of civil penalties.
(3) Such site, facility and equipment access, and sampling and monitoring shall be subject to the site's safety and industrial hygiene procedures, and Food and Drug Administration Good Manufacturing Practice requirements (21 CFR parts 210 and 211) in force at the site.
(l) Transfer of ownership. The terms of the permit are transferable to a new owner upon sale of the site, in accordance with provisions specified by the permit.
(m) Permit issuance. The permitting authority shall provide for public participation prior to issuing a permit pursuant to this section. At a minimum, the permitting authority shall:
(1) Make available for public inspection, in at least one location in the area of the site, the information submitted by the permittee, the permitting authority's analysis of the effect on air quality including the preliminary determination, and a copy or summary of any other materials considered in making the preliminary determination;
(2) Notify the public, by advertisement in a newspaper of general circulation in the area of the site, of the application, the preliminary determination, and of the opportunity for comment at a public hearing as well as written public comment;
(3) Provide a 30-day period for submittal of public comment;
(4) Send a copy of the notice of public comment to the following: the Administrator, through the appropriate Regional Office; any other State or local air pollution control agencies, the chief executives of the city and county where the site is located; any State, Federal Land Manager, or other governing body whose lands may be affected by emissions from the site.
(5) Provide opportunity for a public hearing for interested persons to appear and submit written or oral comments on the air quality impact of the site, the control technology required, and other appropriate considerations.
(n) Permit modifications. The permit shall specify the conditions under which the permit may be modified by the permitting authority. The permitting authority shall modify the permit in accordance with the procedures set forth in this paragraph.
(1) Permit modifications that require public participation. For any change that does not meet the criteria for an administrative permit modification established in paragraph (n)(2)(i) of this section, the permitting authority shall provide an opportunity for public participation, consistent with the provisions of paragraph (m) of this section, prior to processing the permit modification.
(2) Administrative permit modification. (i) An administrative permit modification is a permit revision that:
(A) Corrects typographical errors;
(B) Identifies a change in the name, address, or phone number of any person identified in the permit, or provides a similar minor administrative change at the site;
(C) Requires more frequent monitoring, recordkeeping, or reporting by the permittee;
(D) Allows for a change in ownership or operational control of a source where the permitting authority determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the permitting authority.
(E) Updates the emission calculation methods specified in the permit, provided that the change does not also involve a change to any site-wide emissions cap.
(F) Changes the monitoring, recordkeeping or reporting requirements for equipment that has been shutdown or is no longer in service.
(G) Any other change that is stipulated in the permit as qualifying as an administrative permit modification, provided that the permit condition which includes such stipulation has already undergone public participation in accordance with paragraph (m) of this section.
(ii) An administrative permit modification may be made by the permitting authority consistent with the following procedures:
(A) The permitting authority shall take final action on any request for an administrative permit modification within 60 days from receipt of the request, and may incorporate such changes without providing notice to the public, provided that the permitting authority designates any such permit revisions as having been made pursuant to this paragraph.
(B) The permitting authority shall submit a copy of the revised permit to the Administrator.
(C) The site may implement the changes addressed in the request for an administrative permit modification immediately upon submittal of the request to the permitting authority.
(o) Delegation of authority. (1) The Administrator shall have the authority to delegate the responsibility to implement this section in accordance with the provisions of this paragraph.
(2) Where the Administrator delegates the responsibility for implementing this section to any agency other than a Regional Office of the Environmental Protection Agency, the following provisions shall apply:
(i) Where the delegate agency is not an air pollution control agency, it shall consult with the appropriate State and local air pollution control agency prior to making any determination under this section. Similarly, where the delegate agency does not have continuing responsibility for managing land use, it shall consult with the appropriate State and local agency primarily responsible for managing land use prior to making any determination under this section.
(ii) The delegate agency shall send a copy of any public comment notice required under paragraph (n) of this section to the Administrator through the appropriate Regional Office.
§ 52.2460 - Small business stationary source technical and environmental compliance assistance program.
On November 10, 1992, the Executive Director of the Virginia Department of Air Pollution Control submitted a plan for the establishment and implementation of a Small Business Stationary Source Technical and Environmental Compliance Assistance Program as a State Implementation Plan revision, as required by title V of the Clean Air Act. EPA approved the Small Business Stationary Source Technical and Environmental Compliance Assistance Program on February 4, 1994, and made it a part of the Virginia SIP. As with all components of the SIP, Virginia must implement the program as submitted and approved by EPA.
§ 52.2465 - Original identification of plan section.
(a) This section identifies the original “Air Implementation Plan for the Commonwealth of Virginia” and all revisions submitted by Virginia that were federally approved prior to March 1, 2000. The information in this section is available in the 40 CFR, part 52, Volume 2 of 2 (§§ 52.1019 to the end of part 52) editions revised as of July 1, 2000 through July 1, 2011, and the 40 CFR, part 52, Volume 3 of 3 (§§ 52.2020 to the end of part 52) edition revised as of July 1, 2012.
(b) [Reserved]