United States Code
USC most recently checked for updates: Sep 22, 2023
Standards applicable to solid waste incineration units promulgated under section 7411 of this title and this section shall reflect the maximum degree of reduction in emissions of air pollutants listed under section 1
Standards under section 7411 of this title and this section applicable to solid waste incineration units shall be based on methods and technologies for removal or destruction of pollutants before, during, or after combustion, and shall incorporate for new units siting requirements that minimize, on a site specific basis, to the maximum extent practicable, potential risks to public health or the environment.
The performance standards promulgated under section 7411 of this title and this section and applicable to solid waste incineration units shall specify numerical emission limitations for the following substances or mixtures: particulate matter (total and fine), opacity (as appropriate), sulfur dioxide, hydrogen chloride, oxides of nitrogen, carbon monoxide, lead, cadmium, mercury, and dioxins and dibenzofurans. The Administrator may promulgate numerical emissions limitations or provide for the monitoring of postcombustion concentrations of surrogate substances, parameters or periods of residence time in excess of stated temperatures with respect to pollutants other than those listed in this paragraph.
Not later than 5 years following the initial promulgation of any performance standards and other requirements under this section and section 7411 of this title applicable to a category of solid waste incineration units, and at 5 year intervals thereafter, the Administrator shall review, and in accordance with this section and section 7411 of this title, revise such standards and requirements.
Performance standards under this section and section 7411 of this title for solid waste incineration units shall include guidelines promulgated pursuant to section 7411(d) of this title and this section applicable to existing units. Such guidelines shall include, as provided in this section, each of the elements required by subsection (a) (emissions limitations, notwithstanding any restriction in section 7411(d) of this title regarding issuance of such limitations), subsection (c) (monitoring), subsection (d) (operator training), subsection (e) (permits), and subsection (h)(4) 2
Not later than 1 year after the Administrator promulgates guidelines for a category of solid waste incineration units, each State in which units in the category are operating shall submit to the Administrator a plan to implement and enforce the guidelines with respect to such units. The State plan shall be at least as protective as the guidelines promulgated by the Administrator and shall provide that each unit subject to the guidelines shall be in compliance with all requirements of this section not later than 3 years after the State plan is approved by the Administrator but not later than 5 years after the guidelines were promulgated. The Administrator shall approve or disapprove any State plan within 180 days of the submission, and if a plan is disapproved, the Administrator shall state the reasons for disapproval in writing. Any State may modify and resubmit a plan which has been disapproved by the Administrator.
The Administrator shall develop, implement and enforce a plan for existing solid waste incineration units within any category located in any State which has not submitted an approvable plan under this subsection with respect to units in such category within 2 years after the date on which the Administrator promulgated the relevant guidelines. Such plan shall assure that each unit subject to the plan is in compliance with all provisions of the guidelines not later than 5 years after the date the relevant guidelines are promulgated.
Not later than 24 months after
Beginning (1) 36 months after the promulgation of a performance standard under subsection (a) and section 7411 of this title applicable to a category of solid waste incineration units, or (2) the effective date of a permit program under subchapter V in the State in which the unit is located, whichever is later, each unit in the category shall operate pursuant to a permit issued under this subsection and subchapter V. Permits required by this subsection may be renewed according to the provisions of subchapter V. Notwithstanding any other provision of this chapter, each permit for a solid waste incineration unit combusting municipal waste issued under this chapter shall be issued for a period of up to 12 years and shall be reviewed every 5 years after date of issuance or reissuance. Each permit shall continue in effect after the date of issuance until the date of termination, unless the Administrator or State determines that the unit is not in compliance with all standards and conditions contained in the permit. Such determination shall be made at regular intervals during the term of the permit, such intervals not to exceed 5 years, and only after public comment and public hearing. No permit for a solid waste incineration unit may be issued under this chapter by an agency, instrumentality or person that is also responsible, in whole or part, for the design and construction or operation of the unit. Notwithstanding any other provision of this subsection, the Administrator or the State shall require the owner or operator of any unit to comply with emissions limitations or implement any other measures, if the Administrator or the State determines that emissions in the absence of such limitations or measures may reasonably be anticipated to endanger public health or the environment. The Administrator’s determination under the preceding sentence is a discretionary decision.
Performance standards and other requirements promulgated pursuant to this section and section 7411 of this title and applicable to new solid waste incineration units shall be effective as of the date 6 months after the date of promulgation.
Performance standards and other requirements promulgated pursuant to this section and section 7411 of this title and applicable to existing solid waste incineration units shall be effective as expeditiously as practicable after approval of a State plan under subsection (b)(2) (or promulgation of a plan by the Administrator under subsection (b)(3)) but in no event later than 3 years after the State plan is approved or 5 years after the date such standards or requirements are promulgated, whichever is earlier.
After the effective date of any performance standard, emission limitation or other requirement promulgated pursuant to this section and section 7411 of this title
For purposes of sections 7411(e), 7413, 7414, 7416, 7420, 7603, 7604, 7607 of this title and other provisions for the enforcement of this chapter, each performance standard, emission limitation or other requirement established pursuant to this section by the Administrator or a State or local government, shall be treated in the same manner as a standard of performance under section 7411 of this title which is an emission limitation.
The term “solid waste incineration unit” means a distinct operating unit of any facility which combusts any solid waste material from commercial or industrial establishments or the general public (including single and multiple residences, hotels, and motels). Such term does not include incinerators or other units required to have a permit under section 3005 of the Solid Waste Disposal Act [42 U.S.C. 6925]. The term “solid waste incineration unit” does not include (A) materials recovery facilities (including primary or secondary smelters) which combust waste for the primary purpose of recovering metals, (B) qualifying small power production facilities, as defined in section 796(17)(C) of title 16, or qualifying cogeneration facilities, as defined in section 796(18)(B) of title 16, which burn homogeneous waste (such as units which burn tires or used oil, but not including refuse-derived fuel) for the production of electric energy or in the case of qualifying cogeneration facilities which burn homogeneous waste for the production of electric energy and steam or forms of useful energy (such as heat) which are used for industrial, commercial, heating or cooling purposes, or (C) air curtain incinerators provided that such incinerators only burn wood wastes, yard wastes and clean lumber and that such air curtain incinerators comply with opacity limitations to be established by the Administrator by rule.
The term “new solid waste incineration unit” means a solid waste incineration unit the construction of which is commenced after the Administrator proposes requirements under this section establishing emissions standards or other requirements which would be applicable to such unit or a modified solid waste incineration unit.
The term “modified solid waste incineration unit” means a solid waste incineration unit at which modifications have occurred after the effective date of a standard under subsection (a) if (A) the cumulative cost of the modifications, over the life of the unit, exceed 50 per centum of the original cost of construction and installation of the unit (not including the cost of any land purchased in connection with such construction or installation) updated to current costs, or (B) the modification is a physical change in or change in the method of operation of the unit which increases the amount of any air pollutant emitted by the unit for which standards have been established under this section or section 7411 of this title.
The term “existing solid waste incineration unit” means a solid waste unit which is not a new or modified solid waste incineration unit.
The term “municipal waste” means refuse (and refuse-derived fuel) collected from the general public and from residential, commercial, institutional, and industrial sources consisting of paper, wood, yard wastes, food wastes, plastics, leather, rubber, and other combustible materials and non-combustible materials such as metal, glass and rock, provided that: (A) the term does not include industrial process wastes or medical wastes that are segregated from such other wastes; and (B) an incineration unit shall not be considered to be combusting municipal waste for purposes of section 7411 of this title or this section if it combusts a fuel feed stream, 30 percent or less of the weight of which is comprised, in aggregate, of municipal waste.
The terms “solid waste” and “medical waste” shall have the meanings established by the Administrator pursuant to the Solid Waste Disposal Act [42 U.S.C. 6901 et seq.].
Nothing in this section shall preclude or deny the right of any State or political subdivision thereof to adopt or enforce any regulation, requirement, limitation or standard relating to solid waste incineration units that is more stringent than a regulation, requirement, limitation or standard in effect under this section or under any other provision of this chapter.
Nothing in this section shall diminish the authority of the Administrator or a State to establish any other requirements applicable to solid waste incineration units under any other authority of law, including the authority to establish for any air pollutant a national ambient air quality standard, except that no solid waste incineration unit subject to performance standards under this section and section 7411 of this title shall be subject to standards under section 7412(d) of this title.
A solid waste incineration unit shall not be a utility unit as defined in subchapter IV–A: Provided, That, more than 80 per centum of its annual average fuel consumption measured on a Btu basis, during a period or periods to be determined by the Administrator, is from a fuel (including any waste burned as a fuel) other than a fossil fuel.
No requirement of an applicable implementation plan under section 7475 of this title (relating to construction of facilities in regions identified pursuant to section 7407(d)(1)(A)(ii) or (iii) of this title) or under section 7502(c)(5) of this title (relating to permits for construction and operation in nonattainment areas) may be used to weaken the standards in effect under this section.