U.S. Code of Federal Regulations
Regulations most recently checked for updates: Sep 16, 2025
2825.202 - 2825.202 Exceptions.
The authority to make the determinations prescribed in FAR 25.202(a)(1) is delegated to the HCA, or designee.
2825.204 - 2825.204 Evaluating offers of foreign construction material.
The HCA, or designee at a level at or above the BPC, is the agency official authorized to make the determination in accordance with FAR 25.204(b) that using a particular domestic construction material would unreasonably increase the cost of the acquisition or would be impracticable.