U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 27, 2025
A fixed bridge shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the movable bridge shall he prepared as a part of the preliminary plans.