U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 28, 2025
The draw of the S433 Bridge, mile 2.0, at Slidell, shall open on signal, except that between 7 p.m. to 7 a.m., the draw shall open on signal if at least two hours notice is given.