U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 28, 2025
The draw of the S437 bridge, mile 0.7 at West Annapolis, shall open on signal from sunrise to sunset from May 1 through September 30. At all other times, the draw shall open on signal if at least five hours notice is given.