U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 27, 2025
(a) The manufacturer must submit any proposed changes in design, material, or construction to the recognized laboratory for approval before changing throwable PFD production methods.
(b) Determinations of equivalence of design, construction, and materials may be made only by the Commandant or a designated representative.