U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 28, 2025
The designee authorized to specify a percentage higher than the 6 percent that the contracting officer must add to the cost of any foreign construction material proposed for exception from the requirements of the Buy America Act is set forth in CAM 1301.70.