U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 27, 2025
Hoses used in LNG or flammable refrigerant transfer systems must be:
(a) Tested once each calendar year, but with intervals not exceeding 15 months, to the maximum pump pressure or relief valve setting; and
(b) Visually inspected for damage or defects before each use.