U.S. Code of Federal Regulations
Regulations most recently checked for updates: Aug 27, 2025
Switch obstruction test of lock rod of each power-operated switch and lock rod of each hand-operated switch equipped with switch-and-lock-movement shall be made when lock rod is placed in service or changed out, but not less than once each month.