The existing engineering plan for flood control in the alluvial valley of the Mississippi River is modified so as to provide for the construction of plan 4 as set forth in the report of the Mississippi River Commission, dated
The project for flood control of the Yazoo River shall be as authorized by sections 642a, 702a–1, 702a–2 to 702a–12, 702g–1, 702j–1, 702j–2, 702k–1, and 702k–2 of this title, except that the Chief of Engineers may, in his discretion, from time to time, substitute therefor combinations of reservoirs, levees, and channel improvements; and except that the extension of the authorized project and improvements contemplated in plan C of the report of
In the development of the authorized project, the construction of a levee and improvements contemplated in the report of
The Chief of Engineers, with approval of the Secretary of the Army, shall reimburse local authorities for actual expenditures found by the Chief of Engineers to be reasonable, for providing at the request of the United States, in accordance with local legal procedure or custom, rights-of-way and flowage easements required for future setbacks of main-line Mississippi River levees.
The existing engineering plan for flood control of the Saint Francis River is modified so as to permit the substitution for the suspended portions of the original project below Oak Donnick, Arkansas, of the construction of a ditch in Cross County, Arkansas, beginning in the vicinity of the outlet end of the existing Oak Donnick to Saint Francis Bay floodway and terminating in Saint Francis Bay about two miles north of Riverfront, including the construction of a highway bridge at State Highway Numbered 42 made necessary by the ditch construction: Provided, That local interests give assurances satisfactory to the Secretary of the Army that they will (1) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction; (2) hold and save the United States free from damages due to the construction works; and (3) maintain the works after completion in accordance with regulations prescribed by the Secretary of the Army.
In the development of the authorized project, the construction of improvements for Bayou Rapides, Boeuf, and Cocodrie, Louisiana, contemplated in the report dated
The total authorizations heretofore made for the flood control project of the alluvial valley of the Mississippi River shall not be increased by reason of any provision in this Act, except for the additional amounts necessary for the Yazoo and Red River backwater improvements, and any appropriations heretofore or hereafter made or authorized for said project as herein or heretofore modified may be expended upon any feature of the said project, notwithstanding any restrictions, limitations, or requirements of existing law: Provided, That funds hereafter expended for maintenance shall not be considered as reducing present remaining balances of authorizations.