United States Code
USC most recently checked for updates: Sep 29, 2023
It is declared to be the policy of the Congress to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government should participate and cooperate with States and local interests in developing such water supplies in connection with the construction, maintenance, and operation of Federal navigation, flood control, irrigation, or multiple purpose projects.
In carrying out the policy set forth in this section, it is provided that storage may be included in any reservoir project surveyed, planned, constructed or to be planned, surveyed and/or constructed by the Corps of Engineers or the Bureau of Reclamation to impound water for present or anticipated future demand or need for municipal or industrial water, and the reasonable value thereof may be taken into account in estimating the economic value of the entire project: Provided, That the cost of any construction or modification authorized under the provisions of this section shall be determined on the basis that all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the Secretary of the Army or the Secretary of the Interior, as the case may be: Provided further, That before construction or modification of any project including water supply provisions for present demand is initiated, State or local interests shall agree to pay for the cost of such provisions in accordance with the provisions of this section: And provided further, That (1) for Corps of Engineers projects, not to exceed 30 percent of the total estimated cost of any project may be allocated to anticipated future demands, and, (2) for Bureau of Reclamation projects, not to exceed 30 per centum of the total estimated cost of any project may be allocated to anticipated future demands where State or local interests give reasonable assurances, and there is reasonable evidence, that such demands for the use of such storage will be made within a period of time which will permit paying out the costs allocated to water supply within the life of the project: And provided further, That for Corps of Engineers projects, the Secretary of the Army may permit the full non-Federal contribution to be made, without interest, during construction of the project, or, with interest, over a period of not more than thirty years from the date of completion, with repayment contracts providing for recalculation of the interest rate at, five-year intervals, and for Bureau of Reclamation projects, the entire amount of the construction costs, including interest during construction, allocated to water supply shall be repaid within the life of the project but in no event to exceed fifty years after the project is first used for the storage of water for water supply purposes, except that (1) no payment need be made with respect to storage for future water supply until such supply is first used, and (2) no interest shall be charged on such cost until such supply is first used, but in no case shall the interest-free period exceed ten years. For Corps of Engineers projects, all annual operation and maintenance costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests on an annual basis, and all repair, rehabilitation, and replacement costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests (1) without interest, during construction of the repair, rehabilitation, or replacement, (2) with interest, in lump sum on the completion of the repair, rehabilitation, or replacement, or (3) at the request of the State or local interest, with interest, over a period of not more than 25 years beginning on the date of completion of the repair, rehabilitation, or replacement, with repayment contracts providing for recalculation of the interest rate at 5-year intervals. At the request of the State or local interest, the Secretary of the Army shall amend a repayment contract entered into under this section on or before
For the period beginning 180 days after
For water resource development projects managed by the Secretary, a State or local interest that the Secretary determines has complied with paragraph (1) may request from the Secretary a release to the United States of any right of the State or local interest to future water storage under this Act that was allocated for future use water supply prior to
Not later than 180 days after receiving a request under paragraph (2), the Secretary shall provide to the applicable State or local interest a written decision on whether the Secretary recommends releasing future water storage rights.
If the Secretary recommends releasing future water storage rights, the Secretary shall include that recommendation in the annual plan submitted under section 2282d of title 33.
Nothing in this subsection authorizes the Secretary to release a State or local interest from a contractual obligation unless specifically authorized by Congress.
The provisions of this section shall not be construed to modify the provisions of section 701–1 of title 33 and section 390 of this title, as amended and extended, or the provisions of sections 372 and 383 of this title.
Modifications of a reservoir project heretofore authorized, surveyed, planned, or constructed to include storage as provided in subsection (b) which would seriously affect the purposes for which the project was authorized, surveyed, planned, or constructed, or which would involve major structural or operational changes shall be made only upon the approval of Congress as now provided by law.