The total costs remaining after the allocations under clauses (i) and (ii) of subparagraph (A) shall be reimbursable as provided for in paragraphs (2), (3), (4), and (5).
Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title, allocated for repayment by the lower basin under subsection (a)(2) shall be paid in accordance with section 1543(g)(2) of this title, from the Lower Colorado River Basin Development Fund.
Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title allocated for repayment by the upper basin under subsection (a)(2) shall be paid in accordance with section 620d(d)(5) of this title from the Upper Colorado River Basin Fund within the limit of the funds made available under subsection (e).
The Secretary is authorized to make upward adjustments in rates charged for electrical energy under all contracts administered by the Secretary under the Colorado River Storage Project Act (70 Stat. 105; 43 U.S.C. 620) as soon as practicable and to the extent necessary to cover the costs allocated to the Upper Colorado River Basin Fund under subsection (a)(2) and in conformity with subsection (a)(3), subsection (a)(4) and subsection (a)(5): Provided, That revenues derived from said rate adjustments shall be available solely for the construction, operation, maintenance, and replacement of salinity control units, for the construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and for the implementation of on-farm measures in the Colorado River Basin herein authorized.
Effective beginning on the date of enactment of this paragraph, subject to paragraph (3), the cost share obligations required by this section shall be met through an up-front cost share from the Basin Funds, in the same proportions as the cost allocations required under subsection (a), as provided in paragraph (2).
The Secretary shall expend the required cost share funds described in paragraph (1) through the Basin States Program for salinity control activities established under section 1592(a)(7) of this title.
The cost share contribution required by this section shall continue to be met through repayment in a manner consistent with this section for all salinity control activities for which repayment was commenced prior to the date of enactment of this paragraph.